Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line

被引:25
作者
Sikora, R [1 ]
Chhajed, D [1 ]
Shaw, MJ [1 ]
机构
[1] UNIV ILLINOIS,DEPT BUSINESS ADM,CHAMPAIGN,IL 61820
关键词
D O I
10.1016/0360-8352(96)00183-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper we consider a general problem of scheduling a single how line consisting of multiple machines and producing a given set of jobs. The manufacturing environment is characterized by sequence dependent set-up times, limited intermediate buffer space, and capacity constraints. In addition, jobs are assigned with due dates that have to be met. The objectives of the scheduling are: (1) to meet the due dates without violating the capacity constraints, (2) to minimize the makespan, and (3) to minimize the inventory holding costs. While most of the approaches in the literature treat the problem pf scheduling in flow lines as two independent sub-problems of lot-sizing and sequencing, our approach integrates the lot-sizing and sequencing heuristics. The integrated approach uses the Silver-Meal heuristic (modified to include lot-splitting) for lot-sizing and an improvement procedure applied to Palmer's heuristic for sequencing, which takes into account the actual sequence dependent set-up times and the limited intermedite buffer capacity. We evaluate the performance of the integrated approach and demonstrate its efficacy for scheduling a real world SMT manufacturing environment. Copyright (C) 1996 Elsevier Science Ltd
引用
收藏
页码:659 / 679
页数:21
相关论文
共 31 条
[1]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[2]  
ARAS OA, 1982, J OPERATIONS MANAGEM, V2, P177
[3]   A CYCLICAL SCHEDULING HEURISTIC FOR LOT SIZING WITH CAPACITY CONSTRAINTS [J].
BAHL, HC ;
RITZMAN, LP .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (05) :791-800
[4]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[5]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[6]  
BITRAN GR, 1984, MANAGE SCI, V31, P1121
[7]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[8]   AN ECONOMIC LOT-SIZING TECHNIQUE .I. PART-PERIOD ALGORITHM [J].
DEMATTEIS, JJ .
IBM SYSTEMS JOURNAL, 1968, 7 (01) :30-+
[9]   JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS [J].
DILTS, DM ;
RAMSING, KD .
DECISION SCIENCES, 1989, 20 (01) :120-133
[10]  
DZIELINSKI B, 1965, MANAGE SCI, V7, P874