Generation scheduling with thermal stress constraints

被引:33
作者
Li, ZY [1 ]
Shahidehpour, M [1 ]
机构
[1] IIT, Elect Power & Power Elect Ctr, Chicago, IL 60616 USA
关键词
Lagrangian relaxation; ramp rates; short term generation scheduling; simulated annealing; thermal stress;
D O I
10.1109/TPWRS.2003.818698
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes a scheduling method for representing the thermal stress of turbine shafts as ramp rate constraints in the thermal commitment and dispatch of generating units. The paper uses Lagrangian relaxation for optimal generation scheduling. In applying the unit commitment, thermal stress over the elastic limit is used for calculating the ramping cost. The thermal stress contribution to generation cost requires the calculation of a set that includes thermal stress at the end of each time step; this requirement presents a complicated problem which cannot be solved by an ordinary optimization method such as dynamic programming. The paper uses an improved simulated annealing method to determine the optimal trajectory of each generating unit. Furthermore, the paper uses linear programming for economic dispatch in which thermal stress limits are incorporated in place of fixed ramp rate limits. The paper illustrates the economics of frequently ramping up/down of low cost generating units versus the cost of replacement of their turbine rotors with a shorter life span. The experimental results for a practical system demonstrate the effectiveness of the proposed method in optimizing the power system generation scheduling.
引用
收藏
页码:1402 / 1409
页数:8
相关论文
共 15 条
[1]  
[Anonymous], 1987, SIMULATED ANNEALING
[2]   Optimal response of a thermal unit to an electricity spot market [J].
Arroyo, JM ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :1098-1104
[3]  
COHEN AI, 1990, PROCEEDINGS OF THE TENTH POWER SYSTEMS COMPUTATION CONFERENCE, P1107
[4]   LINEAR-PROGRAMMING APPLICATIONS TO POWER-SYSTEM ECONOMICS, PLANNING AND OPERATIONS [J].
DELSON, JK ;
SHAHIDEHPOUR, SM ;
BLOOM, JA ;
MANHIRE, B ;
SMITH, WC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :1155-1163
[5]   THERMAL-STRESS COMPUTATION FOR STEAM-ELECTRIC GENERATOR DISPATCH [J].
DELSON, JK .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (01) :120-126
[6]  
GUAN XH, 1991, 1991 POWER INDUSTRY COMPUTER APPLICATION CONFERENCE : CONFERENCE PAPER, P120, DOI 10.1109/PICA.1991.160665
[7]   OPTIMIZATION BY SIMULATED ANNEALING [J].
KIRKPATRICK, S ;
GELATT, CD ;
VECCHI, MP .
SCIENCE, 1983, 220 (4598) :671-680
[8]   Unit commitment with transmission security and voltage constraints [J].
Ma, HL ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :757-764
[9]  
Shahidehpour HYM., 2002, MARKET OPERATIONS EL
[10]  
Shahidehpour M., 2000, MAINTENANCE SCHEDULI