Balancing assembly line with skilled and unskilled workers

被引:106
作者
Corominas, Albert [1 ]
Pastor, Rafael [1 ]
Plans, Joan [1 ]
机构
[1] Univ Politecn Cataluna, IOC Res Inst, E-08028 Barcelona, Spain
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2008年 / 36卷 / 06期
关键词
line balancing; application; manufacturing; production;
D O I
10.1016/j.omega.2006.03.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we present the process of rebalancing the line at motorcycle-assembly plant. The company found it necessary to rebalance its line, since it needs to increase production in the spring and summer months. The main characteristics of the problem are as follows: (i) the company hires temporary staff, who need more time to carry out their tasks than permanent workers; (ii) there must always be at least one skilled employee working alongside an unskilled one; and (iii) different task groups are incompatible with each other (clean-hands tasks and dirty-hands tasks). The goal is to minimise the number of temporary workers required, given a cycle time and the team of workers on staff. The problem is modelled as a binary linear program (BLP) and solved optimally by means of the ILOG CPLEX 9.0 optimiser. The solution provided, namely 12 permanent workers (skilled) and two temporary workers (unskilled), is an improvement on the solution implemented by the business, which involved 12 permanent workers and four temporary workers. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1126 / 1132
页数:7
相关论文
共 19 条
[11]   Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations [J].
McMullen, PR ;
Frazier, GV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (10) :2717-2741
[12]   Optimally balancing assembly lines with different workstations [J].
Nicosia, G ;
Pacciarelli, D ;
Pacifici, A .
DISCRETE APPLIED MATHEMATICS, 2002, 118 (1-2) :99-113
[13]   Assembly system design: A branch and cut approach [J].
Pinnoi, A ;
Wilhelm, WE .
MANAGEMENT SCIENCE, 1998, 44 (01) :103-118
[14]  
POMES J, 2001, PROYECTO FINAL CARRE
[15]   State of art of optimization methods for assembly line design [J].
Rekiek, Brahim ;
Dolgui, Alexandre ;
Delchambre, Alain ;
Bratcu, Antoneta .
Annual Reviews in Control, 2002, 26 II :163-174
[16]   Hybrid assembly line design and user's preferences [J].
Rekiek, B ;
De Lit, P ;
Delchambre, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (05) :1095-1111
[17]   State-of-the-art exact and heuristic solution procedures for simple assembly line balancing [J].
Scholl, A ;
Becker, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :666-693
[18]  
Wee T. S., 1982, Operations Research Letters, V1, P56, DOI 10.1016/0167-6377(82)90046-3
[19]   FORMULATION OF A PROBLEM INVOLVING ASSEMBLY LINES WITH MULTIPLE MANNING OF WORK STATIONS [J].
WILSON, JM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (01) :59-63