Multiple machine continuous setup lotsizing with sequence-dependent setups

被引:30
作者
Almada-Lobo, Bernardo [1 ]
Klabjan, Diego [2 ]
Carravilla, Maria Antonia [3 ]
Oliveira, Jose F. [3 ]
机构
[1] Univ Porto, DEIG Fac Engn, P-4200465 Oporto, Portugal
[2] Northwestern Univ, Dept Ind Engn & Management Sci, Evanston, IL 60208 USA
[3] Univ Porto, Fac Engn, Inst Engn Sistemas & Comp, P-4200465 Oporto, Portugal
关键词
Continuous setup lotsizing; Sequence-dependent setup; Integer programming; Lagrangian decomposition; Heuristics; LOT-SIZING PROBLEM; SCHEDULING PROBLEM; STARTUP; COSTS;
D O I
10.1007/s10589-009-9235-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Production losses are penalized in the objective function since we deal with a capital intensive industry. We present two mixed integer programming formulations for this problem, which are reduced to a network flow type problem. The two formulations are improved by adding valid inequalities that lead to good lower bounds. We rely on a Lagrangian decomposition based heuristic for generating good feasible solutions. We report computational experiments for randomly generated instances and for real-life data on the aforementioned problem, as well as on a discrete lotsizing and scheduling version.
引用
收藏
页码:529 / 552
页数:24
相关论文
共 22 条
[1]  
Ahuja R., 1993, NETWORK FLOWS THEORY
[2]   Production planning and scheduling in the glass container industry: A VNS approach [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) :363-375
[3]   Single machine multi-product capacitated lot sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
Klabjan, Diego ;
Carravilla, Maria Antonia ;
Oliveira, Jose F. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (20) :4873-4894
[4]  
[Anonymous], 1998, Network optimization: Continuous and discrete models
[5]   A polyhedral approach to a production planning problem [J].
Constantino, M .
ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) :75-95
[6]   THE PERFORMANCE OF ROLLING PRODUCTION SCHEDULES IN A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
IIE TRANSACTIONS, 1995, 27 (05) :564-573
[7]   STUDYING THE EFFECTS OF PRODUCTION LOSS DUE TO SETUP IN DYNAMIC PRODUCTION SCHEDULING [J].
DEMATTA, R ;
GUIGNARD, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :62-73
[8]   DYNAMIC PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
OPERATIONS RESEARCH, 1994, 42 (03) :492-503
[9]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235
[10]   THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP COSTS [J].
FLEISCHMANN, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :395-404