Application of Petri nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling

被引:41
作者
Reddy, JP [1 ]
Kumanan, S [1 ]
Chetty, OVK [1 ]
机构
[1] Indian Inst Technol, Mfg Engn Sect, Madras 600036, Chennai, India
关键词
activity pre-emption; genetic algorithm; multimode multi-resource scheduling; Petri nets; project management;
D O I
10.1007/s001700170184
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Multi-mode and multi-resource constrained scheduling of a project is a complex task. This paper addresses the use of a Petri net as a modelling and scheduling tool in this context. The benefits of Petri nets in project scheduling are discussed. We propose extensions to Petri nets to suit scheduling of activities in a decision CPM. We also propose the use of a P-matrix for token movements in Petri nets. A genetic algorithm is used to find a better solution. Petri-net-aided software including genetic-algorithm-based search and heuristics is described to deal with a multi-mode, multi-constrained scheduling problem with pre-emption of activities.
引用
收藏
页码:305 / 314
页数:10
相关论文
共 30 条
[1]  
ANANTHANARAYANA.K, 1991, J I ENG, P73
[2]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[3]  
BADIRU BA, 1988, PROJECT MANAGEMENT M
[4]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[5]   A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J].
Boctor, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :349-361
[6]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[7]  
CROWSTON W, 1968, 138 CARN MELL U PENN
[8]  
CROWSTON W, 1965, INT J PROD RES, P406
[9]   An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem [J].
Demeulemeester, EL ;
Herroelen, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :334-348
[10]   An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations [J].
DeReyck, B ;
Herroelen, W .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (01) :1-17