Multi-agent based reconfigurable manufacturing execution system

被引:5
作者
Yu, Min [1 ]
Zhang, Weimin [1 ]
Klemm, Peter [1 ]
机构
[1] Tongji Univ, Mech Engn Coll, Shanghai 200092, Peoples R China
来源
2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4 | 2007年
基金
中国国家自然科学基金;
关键词
multi-agent system; reconfigurable manufacturing cell; blackboard architecture; reconfiguring process;
D O I
10.1109/IEEM.2007.4419284
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Fierce market competition forces enterprises and manufacturing systems to organize the manufacturing resources dynamically to react to perturbations of market quickly. As the bridge between shop floor level and control level, Manufacturing Execution System (MES) should be flexible, adaptable, reusable and extendable. To meet these requirements, a two-fold hybrid multi-agent control architecture, which takes advantages of distributed and decentralized control architecture, and the functions of each agent are introduced. In this paper reconfigurable MES (RMES) is realized by a synergy of two concepts: reconfigurable manufacturing cell and blackboard architecture. RAW possesses some characteristics and functions of RMC to enable manufacturing resources to be reconfigured dynamically. As the core agent of the RIMES, configuration agent utilizes the blackboard architecture which has several attractive features such as explicit control, modularity, and structured interaction. To implement the framework, the reconfiguring process of RMES is established.
引用
收藏
页码:718 / +
页数:2
相关论文
共 10 条
[1]  
Burbidge J. L., 1991, J. Oper. Manage., V10, P5, DOI DOI 10.1016/0272-6963(91)90033-T
[2]   A multi-agent-based agile shop floor control system [J].
Chan, FTS ;
Zhang, J .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (10) :764-774
[3]   A distributed Manufacturing Execution System implemented with agents: the PABADIS model [J].
Diep, D ;
Massotte, P ;
Meimouni, A ;
Bratoukhine, A .
INDIN 2003: IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, PROCEEDINGS, 2003, :301-306
[4]  
Hunt J., 2002, BLACKBOARD ARCHITECT
[5]  
Liang Fujun, 2003, Chinese Journal of Mechanical Engineering, V39, P36, DOI 10.3901/JME.2003.06.036
[6]  
LOGENDRAN R, 1992, P 14 ANN C COMP IND, P113
[7]   A COMPREHENSIVE ANALYSIS OF GROUP SCHEDULING HEURISTICS IN A JOB-SHOP CELL [J].
RUBEN, RA ;
MOSIER, CT ;
MAHMOODI, F .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (06) :1343-1369
[8]   The reconfiguration issues in manufacturing systems [J].
Saad, SM .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 138 (1-3) :277-283
[9]  
SADEHKONIECPOL N, 1999, WORKSH NOT AG BAS DE
[10]  
WEI L, 2001, P INF TECH INF NET I, V3, P274