Integrated optimization of production planning and scheduling for a kind of job-shop

被引:49
作者
Zhang, XD [1 ]
Yan, HS [1 ]
机构
[1] Southeast Univ, Res Inst Automat, Nanjing 210096, Jaingsu, Peoples R China
基金
中国国家自然科学基金;
关键词
batches; hybrid genetic algorithm; job-shop; production planning and scheduling; setup;
D O I
10.1007/s00170-003-2042-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses an integrated job-shop production planning and scheduling problem with setup time and batches. It not only considers the setup cost, work-in-process inventory, product demand, and the load of equipment, but also the detailed scheduling constraints. That is a way different from the traditional hierarchical production planning method. The hierarchical methods do not consider the detailed scheduling constraints, so it cannot guarantee to obtain a feasible production plan. Here the integrated problem is formulated as a nonlinear mixed integer program model. And in order to simultaneously optimize the production plan and the schedule, an improved hybrid genetic algorithm (HGA) is given. In the model, the detailed scheduling constraints are used to compute the accurate load of a device in order to obtain a feasible production plan. The heuristic scheduling rules such as the shortest processing time (SPT) and the longest processing time (LPT) are used to generate a better initial solution. Also, a subsection coding strategy is offered to convert the planning and scheduling solution into a chromosome. At last, a comparison is made between the hybrid algorithm and a hierarchical production planning and scheduling method, showing that the hybrid algorithm can solve the problem effectively.
引用
收藏
页码:876 / 886
页数:11
相关论文
共 18 条
[11]   SOLVING THE COMBINED PART SEQUENCING AND TOOL REPLACEMENT-PROBLEM FOR AN AUTOMATED MACHINING CENTER - A TABU SEARCH APPROACH [J].
KOLAHAN, F ;
LIANG, M ;
ZUO, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (04) :731-743
[12]   AN INTEGRATED MODEL FOR JOB-SHOP PLANNING AND SCHEDULING [J].
LASSERRE, JB .
MANAGEMENT SCIENCE, 1992, 38 (08) :1201-1211
[13]   Genetic algorithm approach to earliness and tardiness production scheduling and planning problem [J].
Li, Y ;
Ip, WH ;
Wang, DW .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 54 (01) :65-76
[14]   Job shop scheduling with beam search [J].
Sabuncuoglu, I ;
Bayiz, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 118 (02) :390-412
[15]   SOLVING FUZZY ASSEMBLY-LINE BALANCING PROBLEM WITH GENETIC ALGORITHMS [J].
TSUJIMURA, Y ;
GEN, M ;
KUBOTA, E .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 29 (1-4) :543-547
[16]   Hierarchical stochastic production planning with delay interaction [J].
Yan, HS .
JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 2000, 104 (03) :659-689
[17]  
Yan HS, 2003, IIE TRANS, V35, P711, DOI 10.1080/07408170390225714
[18]   Hierarchical production planning in flexible automated workshops with delay interaction [J].
Yan, HS .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (05) :358-369