Project options valuation with net present value and decision tree analysis

被引:48
作者
De Reyck, Bert
Degraeve, Zeger
Vandenborre, Roger
机构
[1] London Business Sch, London NW1 4SA, England
[2] Katholieke Univ Leuven, B-3000 Louvain, Belgium
关键词
decision analysis; finance; investment analysis; real options analysis; scenarios;
D O I
10.1016/j.ejor.2006.07.047
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Real options analysis (ROA) has been developed to correctly value projects with inherent flexibility, including the possibility to abandon, defer, expand, contract or switch to a different project. ROA allows computing the correct discount rate using the replicating portfolio technique or risk-neutral probability method. We propose an alternative approach for valuing Real Options based on the certainty-equivalent version of the net present value formula, which eliminates the need to identify market-priced twin securities. In addition, our approach can be extended to the case of multinomial trees, a useful tool for modeling uncertainty in projects. We introduce within decision tree analysis (DTA) a method to derive the different discount rates that prevail at different chance nodes. We illustrate the valuation method with an application presented in "A Scenario Approach to Capacity Planning" [Eppen, G.D., Martin, R.K., Schrage, L.E., 1989. A scenario approach to capacity planning. Operations Research, 37 (4)], in which the authors state that for the capacity configuration investment decision studied at General Motors, ". . . there is no scientific way to determine the appropriate discount rate based on estimated demand." Our method allows deriving the scientifically correct discount rates. A major result of the analysis is that the discount rates are endogenously derived from the project structure and its behavior in light of prevailing market conditions, instead of being exogenously imposed. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:341 / 355
页数:15
相关论文
共 16 条
[11]   DISCRETE APPROXIMATIONS OF PROBABILITY-DISTRIBUTIONS [J].
MILLER, AC ;
RICE, TR .
MANAGEMENT SCIENCE, 1983, 29 (03) :352-362
[12]   CAPITAL-ASSET PRICES - A THEORY OF MARKET EQUILIBRIUM UNDER CONDITIONS OF RISK [J].
SHARPE, WF .
JOURNAL OF FINANCE, 1964, 19 (03) :425-442
[13]   VALUING RISKY PROJECTS - OPTION PRICING THEORY AND DECISION-ANALYSIS [J].
SMITH, JE ;
NAU, RF .
MANAGEMENT SCIENCE, 1995, 41 (05) :795-816
[14]   MOMENT METHODS FOR DECISION-ANALYSIS [J].
SMITH, JE .
MANAGEMENT SCIENCE, 1993, 39 (03) :340-358
[15]  
SMITH JE, 1999, OPERATIONS RES, V47
[16]  
Trigeorgis L., 1996, Real Options: Managerial Flexibility and Strategy in Resource Allocation