Dynamic scheduling of manufacturing job shops using genetic algorithms

被引:105
作者
Chryssolouris, G [1 ]
Subramaniam, V
机构
[1] Univ Patras, Dept Mech Engn, Lab Mfg Syst & Automat, GR-26110 Patras, Greece
[2] Natl Univ Singapore, Dept Mech & Prod Engn, Singapore 119260, Singapore
关键词
genetic algorithms; scheduling; manufacturing; job shop;
D O I
10.1023/A:1011253011638
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Most job shop scheduling methods reported in the literature usually address the static scheduling problem. These methods do not consider multiple criteria, nor do they accommodate alternate resources to process a job operation. In this paper, a scheduling method based on genetic algorithms is developed and it addresses all the shortcomings mentioned above. The genetic algorithms approach is a schedule permutation approach that systematically permutes an initial pool of randomly generated schedules to return the best schedule found to date. A dynamic scheduling problem was designed to closely reflect a real job shop scheduling environment. Two performance measures, namely mean job tardiness and mean job cost, were used to demonstrate multiple criteria scheduling. To span a varied job shop environment, three factors were identified and varied between two levels each. The results of this extensive simulation study indicate that the genetic algorithms scheduling approach produces better scheduling performance in comparison to several common dispatching rules.
引用
收藏
页码:281 / 293
页数:13
相关论文
共 44 条
[1]  
Aarts E. H., 1994, ORSA Journal on Computing, V6, P118, DOI 10.1287/ijoc.6.2.118
[2]   2 NEW RULES TO MINIMIZE TARDINESS IN A JOB SHOP [J].
ANDERSON, EJ ;
NYIRENDA, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (12) :2277-2292
[3]  
[Anonymous], PROC INT CARTOGR ASS, DOI DOI 10.5194/ICA-PROC-4-10-2021
[4]  
Booker L. B., 1987, GENETIC ALGORITHMS S, P61
[5]   A BOTTLENECK-BASED BEAM SEARCH FOR JOB SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
CHANG, YL ;
MATSUO, H ;
SULLIVAN, RS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (11) :1949-1961
[6]  
Chryssolouris G., 1992, MANUFACTURING SYSTEM
[7]  
CLEVELAND GA, 1989, PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON GENETIC ALGORITHMS, P160
[8]   PRODUCTION PLANNING AND SCHEDULING USING A FUZZY DECISION SYSTEM [J].
CUSTODIO, LMM ;
SENTIEIRO, JJS ;
BISPO, CFG .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1994, 10 (02) :160-168
[9]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[10]   JOB-SHOP FLOWTIME PREDICTION AND TARDINESS CONTROL USING QUEUING ANALYSIS [J].
ENNS, ST .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (09) :2045-2057