Labour scheduling at an airport refuelling installation

被引:10
作者
Alvarez-Valdes, R [1 ]
Crespo, E [1 ]
Tamarit, JM [1 ]
机构
[1] Univ Valencia, E-46003 Valencia, Spain
关键词
labour scheduling; heuristics; tabu search;
D O I
10.2307/3010684
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We have developed an automatic assignment procedure for labour scheduling at a continously operating airport refuelling installation. Different types of workers are subject to different conditions on the shifts they can do (morning, evening or night), shift lengths, days-off, holidays, terms of contract and working hours. The scheduling process is carried out on a weekly basis, but there are mid-term and long-term conditions and objectives which link each week with the preceding and following weeks. Our package uses firstly a tabu search algorithm to find the best schemes of shifts/days-off to be used to cover the requirements. Secondly an assignment problem is solved to match the schemes with available workers. Finally, the starting and finishing times for each working day are determined for each worker. The system has been designed to run on a personal computer and gives good quality solutions in very short computing times.
引用
收藏
页码:211 / 218
页数:8
相关论文
共 18 条
[1]  
Betchhold S. E., 1991, DEC SC, V22, P683
[2]  
BETCHOLD SE, 1994, EUR J OPER RES, V74, P540
[3]  
BETCHOLD SE, 1994, COMP RES, V21, P1001
[4]  
BETCHOLD SE, 1987, DEC SCI, V18, P89
[5]  
BRUSCO MJ, 1993, J OPER RES SOC, V44, P1191, DOI 10.1038/sj/jors/0441203
[6]   A sequential integer programming method for discontinuous labor tour scheduling [J].
Brusco, MJ ;
Johns, TR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (03) :537-548
[7]   IMPROVING PERSONNEL SCHEDULING AT AIRLINE STATIONS [J].
BRUSCO, MJ ;
JACOBS, LW ;
BONGIORNO, RJ ;
LYONS, DV ;
TANG, BX .
OPERATIONS RESEARCH, 1995, 43 (05) :741-751
[8]   WORK FORCE SIZE AND SINGLE SHIFT SCHEDULES WITH VARIABLE DEMANDS [J].
BURNS, RN ;
CARTER, MW .
MANAGEMENT SCIENCE, 1985, 31 (05) :599-607
[9]   A MODULAR APPROACH TO OPTIMAL MULTIPLE-SHIFT MANPOWER SCHEDULING [J].
BURNS, RN ;
KOOP, GJ .
OPERATIONS RESEARCH, 1987, 35 (01) :100-110
[10]  
Carpaneto G., 1988, Annals of Operations Research, V13, P193