IMPROVING PERSONNEL SCHEDULING AT AIRLINE STATIONS

被引:71
作者
BRUSCO, MJ
JACOBS, LW
BONGIORNO, RJ
LYONS, DV
TANG, BX
机构
[1] NO ILLINOIS UNIV,DE KALB,IL 60115
[2] UNITED AIRLINES,ELK GROVE VILLAGE,IL
关键词
D O I
10.1287/opre.43.5.741
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Many service organizations encounter personnel tour-scheduling problems which focus on the efficient assignment of daily shift schedules and work days to employees across a weekly planning horizon. The airline industry, in particular, faces a highly complex and difficult tour-scheduling environment for their ground station personnel. During the past twenty years, the airlines have worked to improve continuously their abilities to effectively schedule personnel working at planesides, counters, and gates in airline stations. Substantial reductions in labor costs have resulted from the use of efficient tour-scheduling methods for such workers. We report on the development and implementation of two modules designed to enhance the tour-scheduling process associated with United Airlines' Pegasys Manpower Planning System. The first module uses column generation to improve the selection of employee shifts. The second module, a local search heuristic based on simulated annealing, enables initial feasible tour-scheduling solutions to rapidly improve. Using data collected from all 119 United Airlines stations across the U.S., we find that the incorporation of the modules results in a potential annual cost savings of more than $8 million. We conclude with a discussion of notable implementation issues and extensions.
引用
收藏
页码:741 / 751
页数:11
相关论文
共 24 条
[1]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[2]   CYCLIC SCHEDULING VIA INTEGER PROGRAMS WITH CIRCULAR ONES [J].
BARTHOLDI, JJ ;
ORLIN, JB ;
RATLIFF, HD .
OPERATIONS RESEARCH, 1980, 28 (05) :1074-1085
[3]   A GUARANTEED-ACCURACY ROUND-OFF ALGORITHM FOR CYCLIC SCHEDULING AND SET COVERING [J].
BARTHOLDI, JJ .
OPERATIONS RESEARCH, 1981, 29 (03) :501-510
[4]   IMPLICIT MODELING OF FLEXIBLE BREAK ASSIGNMENTS IN OPTIMAL SHIFT SCHEDULING [J].
BECHTOLD, SE ;
JACOBS, LW .
MANAGEMENT SCIENCE, 1990, 36 (11) :1339-1351
[5]   A COMPARATIVE-EVALUATION OF LABOR TOUR SCHEDULING METHODS [J].
BECHTOLD, SE ;
BRUSCO, MJ ;
SHOWALTER, MJ .
DECISION SCIENCES, 1991, 22 (04) :683-699
[6]  
BRUSCO MJ, 1993, NAV RES LOG, V40, P69, DOI 10.1002/1520-6750(199302)40:1<69::AID-NAV3220400105>3.0.CO
[7]  
2-H
[9]  
Dantzig G, 1954, OPER RES, V2, P339, DOI [10.1287/opre.2.3.339, DOI 10.1287/OPRE.2.3.339]
[10]   DECOMPOSITION PRINCIPLE FOR LINEAR-PROGRAMS [J].
DANTZIG, GB ;
WOLFE, P .
OPERATIONS RESEARCH, 1960, 8 (01) :101-111