A COMPARATIVE-EVALUATION OF LABOR TOUR SCHEDULING METHODS

被引:81
作者
BECHTOLD, SE
BRUSCO, MJ
SHOWALTER, MJ
机构
[1] FLORIDA STATE UNIV,COLL BUSINESS,TALLAHASSEE,FL 32306
[2] DEPAUL UNIV,DEPT MANAGEMENT,CHICAGO,IL 60604
关键词
HEURISTICS; LINEAR PROGRAMMING; SCHEDULING; AND SERVICE OPERATIONS MANAGEMENT;
D O I
10.1111/j.1540-5915.1991.tb00359.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents an initial study of relative performance for a number of the labor tour scheduling heuristic methods proposed in the literature. These heuristic methods were classified as either linear programming (LP) based or construction. Each of the methods was applied to a tour scheduling problem, subject to a variety of labor demand requirements distributions, with the singular objective being the minimization of total labor hours scheduled. Statistical analysis revealed that effective tour schedule solutions were generated by both LP‐based and construction methods. Since the performances of the Keith [13], Morris and Showalter [18], and Bechtold and Showalter [5] methods were superior, their solutions were also compared across a number of secondary criteria. An overall analysis of the performances of these three methods resulted in the identification of a number of important managerial and decision‐making issues. We conclude that service operations management should consider integrating these heuristic methods into a decision support system. Finally, suggestions for future research are provided. Copyright © 1991, Wiley Blackwell. All rights reserved
引用
收藏
页码:683 / 699
页数:17
相关论文
共 20 条
[1]   INTEGRATED DAYS OFF AND SHIFT PERSONNEL SCHEDULING [J].
BAILEY, J .
COMPUTERS & INDUSTRIAL ENGINEERING, 1985, 9 (04) :395-404
[2]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[3]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[4]   A GUARANTEED-ACCURACY ROUND-OFF ALGORITHM FOR CYCLIC SCHEDULING AND SET COVERING [J].
BARTHOLDI, JJ .
OPERATIONS RESEARCH, 1981, 29 (03) :501-510
[5]   A METHODOLOGY FOR LABOR SCHEDULING IN A SERVICE OPERATING SYSTEM [J].
BECHTOLD, SE ;
SHOWALTER, MJ .
DECISION SCIENCES, 1987, 18 (01) :89-107
[6]  
BECHTOLD SE, 1981, J OPERATIONS MANAGEM, V1, P155
[7]   SCHEDULING OF WORK FORCES REQUIRED IN CONTINUOUS OPERATIONS UNDER ALTERNATIVE LABOR POLICIES [J].
BROWNELL, WS ;
LOWERRE, JM .
MANAGEMENT SCIENCE, 1976, 22 (05) :597-605
[8]  
Buffa E. S., 1976, DECISION SCI, V7, P620
[9]  
Cohen C., 1978, MULTIPURPOSE OPTIMIZ
[10]  
Dantzig G, 1954, OPER RES, V2, P339, DOI [10.1287/opre.2.3.339, DOI 10.1287/OPRE.2.3.339]