A simulation-based process model for managing complex design projects

被引:213
作者
Cho, SH [1 ]
Eppinger, SD
机构
[1] Univ Calif Los Angeles, Anderson Sch Management, Los Angeles, CA 90095 USA
[2] MIT, Sloan Sch Management, Cambridge, MA 02142 USA
关键词
design iteration; design structure matrix; process modeling; project management; project simulation;
D O I
10.1109/TEM.2005.850722
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper presents a process modeling and analysis technique for managing complex design projects using advanced simulation. The model computes the probability distribution of lead time in a stochastic, resource-constrained project network where iterations take place among sequential, parallel, and overlapped tasks. The model uses the design structure matrix representation to capture the information flows between tasks. We use a simulation-based analysis to account for many realistic aspects of design process behavior which were not possible in previous analytical models. We propose a heuristic for the stochastic, resource-constrained project scheduling problem in an iterative project network. The model can be used for better project planning and control by. identifying leverage points for process improvements, and for evaluating alternative planning and execution strategies. An industrial example is provided to illustrate the utility of the model.
引用
收藏
页码:316 / 328
页数:13
相关论文
共 66 条
[1]   AN IMPROVED CONDITIONAL MONTE-CARLO TECHNIQUE FOR THE STOCHASTIC SHORTEST-PATH PROBLEM [J].
ADLAKHA, VG .
MANAGEMENT SCIENCE, 1986, 32 (10) :1360-1367
[2]   FROM PROJECT TO PROCESS MANAGEMENT - AN EMPIRICALLY-BASED FRAMEWORK FOR ANALYZING PRODUCT DEVELOPMENT TIME [J].
ADLER, PS ;
MANDELBAUM, A ;
NGUYEN, V ;
SCHWERER, E .
MANAGEMENT SCIENCE, 1995, 41 (03) :458-484
[3]   Managing development risk in product design processes [J].
Ahmadi, R ;
Wang, RH .
OPERATIONS RESEARCH, 1999, 47 (02) :235-246
[4]   IS CONCURRENT ENGINEERING ALWAYS A SENSIBLE PROPOSITION [J].
AITSAHLIA, F ;
JOHNSON, E ;
WILL, P .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1995, 42 (02) :166-170
[5]  
ALEXANDER C, 1964, NOTE SYNTHESIS FORM
[6]  
ANDERSSON J, 1998, P ASME DES ENG TECH
[7]  
[Anonymous], ADV PROJECT SCHEDULI
[8]   Modeling relationships among design activities [J].
Belhe, U ;
Kusiak, A .
JOURNAL OF MECHANICAL DESIGN, 1996, 118 (04) :454-460
[9]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[10]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13