A simulation-based process model for managing complex design projects

被引:213
作者
Cho, SH [1 ]
Eppinger, SD
机构
[1] Univ Calif Los Angeles, Anderson Sch Management, Los Angeles, CA 90095 USA
[2] MIT, Sloan Sch Management, Cambridge, MA 02142 USA
关键词
design iteration; design structure matrix; process modeling; project management; project simulation;
D O I
10.1109/TEM.2005.850722
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper presents a process modeling and analysis technique for managing complex design projects using advanced simulation. The model computes the probability distribution of lead time in a stochastic, resource-constrained project network where iterations take place among sequential, parallel, and overlapped tasks. The model uses the design structure matrix representation to capture the information flows between tasks. We use a simulation-based analysis to account for many realistic aspects of design process behavior which were not possible in previous analytical models. We propose a heuristic for the stochastic, resource-constrained project scheduling problem in an iterative project network. The model can be used for better project planning and control by. identifying leverage points for process improvements, and for evaluating alternative planning and execution strategies. An industrial example is provided to illustrate the utility of the model.
引用
收藏
页码:316 / 328
页数:13
相关论文
共 66 条
[61]  
Whitney D. E., 1990, Research in Engineering Design, V2, P3, DOI 10.1007/BF02029818
[62]   CRITICALITY IN STOCHASTIC NETWORKS [J].
WILLIAMS, TM .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (04) :353-357
[63]   PRACTICAL USE OF DISTRIBUTIONS IN NETWORK ANALYSIS [J].
WILLIAMS, TM .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (03) :265-270
[64]  
YASSINE A, 2001, P ASME DES ENG TECH
[65]  
YASSINE A, 2002, UIUC
[66]  
Zeigler BP, 2000, THEORY MODELING SIMU