共 25 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
ALVANCHI A, 2009, P CONSTR RES C SEATT
[3]
Azimi R., 2009, JOINT INT C CONSTR E
[5]
Borshchev A., 2004, SYSTEM DYNAMICS DISC, V22, P25
[8]
CONSCOM: An OO construction scheduling and change management system
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (05)
:368-376
[9]
KeungSik Choi, 2006, Software Process Improvement and Practice, V11, P373, DOI 10.1002/spip.284
[10]
Kuhl F., 1999, Creating computer simulation systems: An introduction to the high level architecture, P5