Benchmarks for shop scheduling problems

被引:179
作者
Demirkol, E [1 ]
Mehta, S [1 ]
Uzsoy, R [1 ]
机构
[1] Purdue Univ, Sch Ind Engn, W Lafayette, IN 47907 USA
关键词
combinatorial optimization; scheduling; benchmarks;
D O I
10.1016/S0377-2217(97)00019-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we present extensive sets of randomly generated test problems for the problems of minimizing makespan (C-max) and maximum lateness (L-max) in flow shops and job shops. The 600 problems include three different types of routings, four different due date configurations and a variety of problem sizes. The problems, as well as the best existing solution and a lower bound on the optimal value are available on the world-wide web. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:137 / 141
页数:5
相关论文
共 21 条
[1]  
Aarts E. H., 1994, ORSA Journal on Computing, V6, P118, DOI 10.1287/ijoc.6.2.118
[2]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[3]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[4]  
Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
[6]   THE ONE-MACHINE PROBLEM WITH DELAYED PRECEDENCE CONSTRAINTS AND ITS USE IN JOB-SHOP SCHEDULING [J].
BALAS, E ;
LENSTRA, JK ;
VAZACOPOULOS, A .
MANAGEMENT SCIENCE, 1995, 41 (01) :94-109
[7]  
BHASKARAN K, 1991, HDB IND ENG, pCH83
[8]   AN ALGORITHM FOR SOLVING THE JOB-SHOP PROBLEM [J].
CARLIER, J ;
PINSON, E .
MANAGEMENT SCIENCE, 1989, 35 (02) :164-176
[9]   A MODIFIED SHIFTING BOTTLENECK PROCEDURE FOR JOB-SHOP SCHEDULING [J].
DAUZEREPERES, S ;
LASSERRE, JB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (04) :923-932
[10]  
DEMIRKOL E, 1996, BENCHMARKING SHOP SC