Parallel machine scheduling problem to minimize the earliness/tardiness costs with learning effect and deteriorating jobs

被引:37
作者
Toksari, M. Duran [1 ]
Guner, Ertan [2 ]
机构
[1] Erciyes Univ, Dept Ind Engn, Kayseri, Turkey
[2] Gazi Univ, Dept Ind Engn, Ankara, Turkey
关键词
Earliness/tardiness; Learning effect; Deterioration jobs; V-shaped property; Parallel machine; Sequence-dependent setup time; Common due date; DEPENDENT PROCESSING TIMES; EARLINESS-TARDINESS COSTS; TOTAL COMPLETION-TIME; COMMON DUE-DATE; SINGLE-MACHINE; FLOW-SHOP; LINEAR DETERIORATION; SHAPED POLICIES; PENALTIES; IMPACT;
D O I
10.1007/s10845-009-0260-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The focus of this work is to analyze parallel machine earliness/tardiness (ET) scheduling problem with simultaneous effects of learning and linear deterioration, sequence-dependent setups, and a common due-date for all jobs. By the effects of learning and linear deterioration, we mean that the processing time of a job is defined by an increasing function of its starting time and a decreasing function of the position in the sequence. We develop a mixed integer programming formulation for the problem and show that the optimal sequence is V-shaped: all jobs scheduled before the shortest jobs and all jobs scheduled after the shortest job are in a non-increasing and non-decreasing order of processing times, respectively. The developed model allows sequence-dependent setups and sequence-dependent early/tardy penalties. The illustrative example with 11 jobs for 2 machines and 3 machines shows that the model can easily provide the optimal solution, which is V-shaped, for problem.
引用
收藏
页码:843 / 851
页数:9
相关论文
共 55 条
[1]  
Alidaee B, 1999, J OPER RES SOC, V50, P711, DOI 10.2307/3010325
[2]  
ALIDAEE B, 1995, J OPER RES SOC, V46, P128
[3]   WEIGHTED-TARDINESS SCHEDULING ON PARALLEL MACHINES WITH PROPORTIONAL WEIGHTS [J].
ARKIN, EM ;
ROUNDY, RO .
OPERATIONS RESEARCH, 1991, 39 (01) :64-81
[4]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[5]  
BAKER KR, 1994, ELEMENTS SEQUENCING
[6]   Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties [J].
Bank, J ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 2001, 33 (4-5) :363-383
[7]   Minimizing the earliness-tardiness costs on a single machine [J].
Bauman, J ;
Józefowska, J .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (11) :3219-3230
[8]   Common due date scheduling with autonomous and induced learning [J].
Biskup, D ;
Simons, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (03) :606-616
[9]   Single-machine scheduling with learning considerations [J].
Biskup, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (01) :173-178
[10]   SCHEDULING DETERIORATING JOBS ON A SINGLE PROCESSOR [J].
BROWNE, S ;
YECHIALI, U .
OPERATIONS RESEARCH, 1990, 38 (03) :495-498