Common due date scheduling with autonomous and induced learning

被引:58
作者
Biskup, D [1 ]
Simons, D [1 ]
机构
[1] Univ Bielefeld, Dept Business Adm & Econ, D-33501 Bielefeld, Germany
关键词
scheduling; common due date; learning curve; knowledge transfer; proactive investments;
D O I
10.1016/j.ejor.2003.06.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Up to now the few existing models, that consider learning effects in scheduling, concentrate on learning-by-doing (autonomous learning). But recent contributions to the literature on learning in manufacturing organizations emphasize the important impact of proactive investments in technological knowledge on the learning rate (induced learning). In the present paper, we focus on a scheduling problem where the processing times decrease according to a learning rate, which can be influenced by an initial cost-inducing investment. Thus we have integrated into our model both aspects of learning-autonomous and induced-thereby highlighting the management's responsibility to invest in technological knowledge enhancement. We have been able to derive some structural properties of the problem and present a polynomially bound solution procedure which optimally solves the problem by using these properties. The optimal solution to the scheduling problem contains-of course-information on the optimal level of proactive investments in learning. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:606 / 616
页数:11
相关论文
共 36 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]   EXTENSION OF LEARNING CURVE - SOME EMPIRICAL RESULTS [J].
BALOFF, N .
OPERATIONAL RESEARCH QUARTERLY, 1971, 22 (04) :329-&
[3]   Single-machine scheduling with learning considerations [J].
Biskup, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (01) :173-178
[4]   Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates [J].
Biskup, D ;
Feldmann, M .
COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (08) :787-801
[5]  
Cochran E.B., 1960, J IND ENG, V11, P317
[6]  
Conway R., 1959, J IND ENG, V10, P39
[7]   DIAGNOSING THE EXPERIENCE CURVE [J].
DAY, GS ;
MONTGOMERY, DB .
JOURNAL OF MARKETING, 1983, 47 (02) :44-58
[8]  
GHEMAWAT P, 1985, HARVARD BUS REV, V63, P143
[9]   A survey of the state-of-the-art of common due date assignment and scheduling research [J].
Gordon, V ;
Proth, JM ;
Chu, CB .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (01) :1-25
[10]   Process innovation and learning by doing in semiconductor manufacturing [J].
Hatch, NW ;
Mowery, DC .
MANAGEMENT SCIENCE, 1998, 44 (11) :1461-1477