Artificial immune system based approach for solving resource constraint project scheduling problem

被引:33
作者
Agarwal, Rina
Tiwari, M. K. [1 ]
Mukherjee, S. K.
机构
[1] Natl Inst Foundry & ForgeTechnol, Dept ForgeTechnol, Ranchi 834003, Bihar, India
[2] Biral Inst Technol, Ranchi 835215, Bihar, India
关键词
project scheduling; precedence constraint; resource constraint; artificial immune system; hypermutation;
D O I
10.1007/s00170-006-0631-2
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, resource-constrained project scheduling problem (RCPSP) is discussed with an objective of minimizing the makespan of a project. Due to its universality, it has a variety of applications as in manufacturing, production planning, project management and elsewhere. It is a well known computationally complex problem, thus warrants the application of heuristics techniques or AI based optimization tools to achieve optimal or near optimal solution in real time. In this research, the artificial immune system (AIS) approach is proposed to solve the aforementioned problem. It exploits the beauty of learning and memory acquisition to ensure the convergence with faster rate. During extensive computational experiment, it is found that the performance of the AIS algorithm on a well known data set of resource-constrained project scheduling problem is superior as compared to GA, fuzzy-GA, LFT, GRU, SIO, MINSLK, RSM, RAN, and MJP based approaches.
引用
收藏
页码:584 / 593
页数:10
相关论文
共 22 条
[1]  
Anderson E. J., 1994, ORSA Journal on Computing, V6, P161, DOI 10.1287/ijoc.6.2.161
[2]  
Baar T., 1999, Meta-heuristics: Advances and trends in local search paradigms for optimization, P1
[3]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[4]   A BOTTLENECK-BASED BEAM SEARCH FOR JOB SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
CHANG, YL ;
MATSUO, H ;
SULLIVAN, RS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (11) :1949-1961
[5]  
DAVIS EW, 1966, J IND ENGINEERING, V17, P177
[6]   Learning and optimization using the clonal selection principle [J].
de Castro, LN ;
Von Zuben, FJ .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (03) :239-251
[7]   Modelling setup times, process batches and transfer batches using activity network logic [J].
Demeulemeester, EL ;
Herroelen, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 89 (02) :355-365
[8]   Distribution requirements and compactness constraints in school timetabling [J].
Drexl, A ;
Salewski, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 102 (01) :193-214
[9]  
Hartmann S, 1998, NAV RES LOG, V45, P733, DOI 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO
[10]  
2-C