Mixed-model assembly line sequencing heuristics for smoothing component parts usage: a comparative analysis

被引:30
作者
Duplaga, EA [1 ]
Bragg, DJ [1 ]
机构
[1] Bowling Green State Univ, Coll Business Adm, Dept Management, Bowling Green, OH 43403 USA
关键词
D O I
10.1080/002075498192850
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the mixed-model sequencing problem by providing a controlled comparison of six sequencing heuristics. The sequencing heuristics are evaluated for several test problems on the basis of their ability to develop a sequence which smoothes out the rate of use of each component part as much as possible. The test problems were designed to determine whether problem size, product range, product structure, or product mix affects the relative ranking of the performance of the heuristics.
引用
收藏
页码:2209 / 2224
页数:16
相关论文
共 15 条
[1]  
[Anonymous], J OPERATIONS MANAGEM
[2]  
[Anonymous], J MANUFACTURING OPER
[3]  
Duplaga E. A., 1996, Production and Inventory Management Journal, V37, P20
[4]  
Fong-Yuen Ding, 1993, Journal of Operations Management, V11, P45, DOI 10.1016/0272-6963(93)90032-K
[5]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[6]   QUICK AND DIRTY SEQUENCING FOR MIXED-MODEL MULTILEVEL JIT SYSTEMS [J].
INMAN, RR ;
BULFIN, RL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (09) :2011-2018
[7]   MINIMIZING VARIATION OF PRODUCTION-RATES IN JUST-IN-TIME SYSTEMS - A SURVEY [J].
KUBIAK, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 66 (03) :259-271
[8]   LEVEL SCHEDULES FOR MIXED-MODEL ASSEMBLY LINES IN JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J .
MANAGEMENT SCIENCE, 1989, 35 (02) :192-207
[9]   SCHEDULING MIXED-MODEL MULTI-LEVEL JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J ;
SINNAMON, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (09) :1487-1509
[10]   REVISITING THE MIXED-MODEL MULTILEVEL JUST-IN-TIME SCHEDULING PROBLEM [J].
MILTENBURG, J ;
SINNAMON, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (07) :2049-2052