The impact of priority rule combinations on lateness and tardiness

被引:44
作者
Barman, S [1 ]
机构
[1] Univ Oklahoma, Michael F Price Coll Business, Div Management, Norman, OK 73019 USA
关键词
D O I
10.1080/07408179808966489
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Several recent studies have explored the concurrent deployment of different priority rules at different processing stages of a manufacturing system. This study investigates the same issue by combining three popular simple priority rules with a combinatorial rule. In a three-stage flow shop, these rules are combined into 64 combination schemes and their performance compared under two shop load levels with two due date setting methods. The performance criteria considered are: mean lateness; mean tardiness; maximum tardiness; and per cent of tardy jobs. The results indicate that the rule combinations are a better strategy than their pure forms when various performance measures are jointly evaluated. Particularly, selected combinations of the Modified Shortest Processing Time, Shortest Processing Time, and the Earliest Due Date rules appear to be very effective. While the extent of shop load level shows little impact on the relative performance of the schemes, the endogenous method of due date setting consistently yields better results than the exogenous method.
引用
收藏
页码:495 / 504
页数:10
相关论文
共 25 条
[11]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[12]  
DOOLEY KJ, 1990, MIDWEST DECISION SCI, P55
[13]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[14]   EXPERIMENTS WITH SIX RULE IN JOB-SHOP SCHEDULING [J].
EILON, S ;
CHOWDHURY, IG ;
SERGHIOU, SS .
SIMULATION, 1975, 24 (02) :45-48
[15]  
EILON S, 1968, INT J PROD RES, V7, P135, DOI DOI 10.1080/00207546808929803
[16]  
Fishman GS., 1978, PRINCIPLES DISCRETE
[17]  
Hermann J. W., 1995, PRODUCTION OPERATION, V4, P30
[18]  
LaForge R.L, 1989, PRODUCTION INVENTORY, V30, P1
[19]   The effect of combining simple priority heuristics in flow-dominant shops [J].
Mahmoodi, F ;
Mosier, CT ;
Guerin, RE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (03) :819-839
[20]  
Oral M., 1973, AIIE Transactions, V5, P357, DOI 10.1080/05695557308974923