Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network

被引:48
作者
Dieu, Vo Ngoc [1 ]
Ongsakul, Weerakorn [1 ]
机构
[1] Asian Inst Technol, Sch Environm Resources & Dev, Klongluang 12120, Pathumthani, Thailand
关键词
augmented Lagrange Hopfield neural network; heuristic search; improved priority list; unit commitment;
D O I
10.1016/j.epsr.2007.02.011
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes an improved priority list (IPL) and augmented Hopfield Lagrange neural network (ALH) for solving ramp rate constrained unit commitment (RUC) problem. The proposed IPL-ALH minimizes the total production cost subject to the power balance, 15 min spinning reserve response time constraint, generation ramp limit constraints, and minimum up and down time constraints. The IPL is a priority list enhanced by a heuristic search algorithm based on the average production cost of units, and the ALH is a continuous Hopfield network whose energy function is based on augmented Lagrangian relaxation. The IPL is used to solve unit scheduling problem satisfying spinning reserve, minimum up and down time constraints, and the ALH is used to solve ramp rate constrained economic dispatch (RED) problem by minimizing the operation cost subject to the power balance and new generator operating frame limits. For hours with insufficient power due to ramp rate or 15 min spinning reserve response time constraints, repairing strategy based on heuristic search is used to satisfy the constraints. The proposed IPL-ALH is tested on the 26-unit IEEE reliability test system, 38-unit and 45-unit practical systems and compared to combined artificial neural network with heuristics and dynamic programming (ANN-DP), improved adaptive Lagrangian relaxation (ILR), constraint logic programming (CLP), fuzzy optimization (170), matrix real coded genetic algorithm (MRCGA), absolutely stochastic simulated annealing (ASSA), and hybrid parallel repair genetic algorithm (HPRGA). The test results indicate that the IPL-ALH obtain less total costs and faster computational times than some other methods. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:291 / 301
页数:11
相关论文
共 23 条
[1]   A practical resource scheduling with OPF constraints [J].
AbdulRahman, KH ;
Shahidehpour, SM ;
Aganagic, M ;
Mokhtari, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) :254-259
[2]  
[Anonymous], EURCS9310 COMP SC DE
[3]   A parallel repair genetic algorithm to solve the unit commitment problem [J].
Arroyo, JM ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (04) :1216-1224
[4]   Enhanced augmented Lagrangian Hopfield network for unit commitment [J].
Dieu, V. N. ;
Ongsakul, W. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) :624-632
[5]  
Dieu V.N., 2005, P 15 POW SYST COMP C
[6]  
DIEU VN, 2007, IN PRESS IET GENERAT
[7]   INTEGER PROGRAMMING APPROACH TO THE PROBLEM OF OPTIMAL UNIT COMMITMENT WITH PROBABILISTIC RESERVE DETERMINATION [J].
DILLON, TS ;
EDWIN, KW ;
KOCHS, HD ;
TAUD, RJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06) :2154-2166
[8]   A fuzzy optimization-based approach to large scale thermal unit commitment [J].
El-Saadawi, MM ;
Tantawi, MA ;
Tawfik, E .
ELECTRIC POWER SYSTEMS RESEARCH, 2004, 72 (03) :245-252
[9]   AN ENHANCED DYNAMIC-PROGRAMMING APPROACH FOR UNIT COMMITMENT [J].
HOBBS, WJ ;
HERMON, G ;
WARNER, S ;
SHEBLE, GB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :1201-1205
[10]   A new thermal unit commitment approach using constraint logic programming [J].
Huang, KY ;
Yang, HT ;
Huang, CL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :936-945