Toward intelligent variable message signs in freeway work zones: Neural network model

被引:66
作者
Hooshdar, S [1 ]
Adeli, H [1 ]
机构
[1] Ohio State Univ, Dept Civil & Environm Engn & Geodet Sci, Columbus, OH 43210 USA
关键词
neural networks; traffic management; highways; transportation networks;
D O I
10.1061/(ASCE)0733-947X(2004)130:1(83)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An increasingly popular method of managing freeway traffic is to use variable message signs (VMS). A neural network model is presented for real-time control of a VMS system in freeway work zones. The neural network is trained to detect the start of a queue in a work zone and provide a message in the freeway upstream. The travelers are informed about the congestion in a work zone when a queue starts to form. The intelligent VMS system can be trained with data for different periods within a day, such as morning and evening rush hours, nonrush hours during the day, and night, for a more detailed traffic flow prediction over the period of one day. Two different neural network training rules are used: the simple backpropagation (BP) and the Levenberg-Marquardt BP algorithms. The network is trained using data adapted from the measured data. Based on different numerical experiments it is observed that the convergence speed of the Levenberg-Marquardt BP algorithm is at least one order of magnitude faster than the simple BP algorithm for the work zone traffic queue detection problem.
引用
收藏
页码:83 / 93
页数:11
相关论文
共 27 条
[1]   Neural networks in civil engineering: 1989-2000 [J].
Adeli, H .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2001, 16 (02) :126-142
[2]   AN ADAPTIVE CONJUGATE-GRADIENT LEARNING ALGORITHM FOR EFFICIENT TRAINING OF NEURAL NETWORKS [J].
ADELI, H ;
HUNG, SL .
APPLIED MATHEMATICS AND COMPUTATION, 1994, 62 (01) :81-102
[3]  
Adeli H., 2001, Construction scheduling, cost optimization and management
[4]  
Adeli H., 1998, Neurocomputing in Design Automation
[5]  
Adeli H., 1995, MACHINE LEARNING NEU
[6]  
Al-Kaisy A, 2000, TRANSPORT RES REC, P154
[7]  
Bazaraa M. S., 2013, NONLINEAR PROGRAMMIN
[8]   Optimal work zone lengths for four-lane highways [J].
Chien, S ;
Schonfeld, P .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2001, 127 (02) :124-131
[9]  
DIXON KK, 1996, CAPACITY DELAY MAJOR
[10]  
DIXON KK, 1996, 1529 TRANSP RES BOAR, P27