Time-cost trade-offs in overlapped product development

被引:98
作者
Roemer, TA [1 ]
Ahmadi, R [1 ]
Wang, RH [1 ]
机构
[1] Univ Calif Los Angeles, Anderson Sch Management, Los Angeles, CA 90095 USA
关键词
D O I
10.1287/opre.48.6.858.12396
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Increasingly shorter product life cycles impel firms to design, develop, and market more products in less time than ever before. Overlapping of design and development stages is commonly regarded as the most promising strategy to reduce product development times. However, overlapping typically requires additional resources and can be costly. Our research addresses the trade-off between product development time and costs and introduces an algorithm to determine an appropriate overlapping strategy under different scenarios. The methodology developed was successfully employed at Rocketdyne Division of Rockwell International.
引用
收藏
页码:858 / 865
页数:8
相关论文
共 24 条
[1]   Managing development risk in product design processes [J].
Ahmadi, R ;
Wang, RH .
OPERATIONS RESEARCH, 1999, 47 (02) :235-246
[2]  
AHMADI RT, 1999, IN PRESS STRUCTURING
[3]  
[Anonymous], UNEASY ALLIANCE
[4]  
[Anonymous], 1972, RES INNOVATION MODER
[5]   RESOURCE-ALLOCATION IN A PERT NETWORK UNDER CONTINUOUS ACTIVITY TIME-COST FUNCTIONS [J].
BERMAN, EB .
MANAGEMENT SCIENCE, 1964, 10 (04) :734-745
[6]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[7]  
Clark K.B., 1991, PRODUCT DEV PERFORMA
[8]  
CLARK KB, 1989, MANAGING INT MANUFAC
[9]   ENGINEERING INFORMATION RELEASE PRIOR TO FINAL DESIGN FREEZE [J].
EASTMAN, RM .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1980, 27 (02) :37-42
[10]  
ELMAGHRA.SE, 1968, J IND ENGINEERING, V19, P48