Intelligent dispatching rules for trip-based material handling systems

被引:31
作者
Bozer, YA
Yen, CK
机构
[1] University of Michigan, Ann Arbor, MI
关键词
trip-based material handling systems; device dispatching; empty vehicle assignment; dynamic dispatching; simulation; AUTOMATED GUIDED VEHICLES; MANUFACTURING SYSTEM;
D O I
10.1016/0278-6125(96)84549-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The literature shows that the manner in which empty devices in a trip-based material handling system are dispatched affects the overall productivity of the handling system. Existing dispatching rules: (1) do not assign a move request until a device deposits a load and becomes empty; (2) with the exception of one rule do not allow an empty device to be reassigned to another move request; (3) do not consider the status and current assignment(s) of other devices before assigning a move request; and (4) may lead to sizable empty travel (also known in industry as ''dead-heading''), which reduces system efficiency. This paper presents two new dispatching rules, modified shortest travel time first (MOD STTF) and bidding-based dynamic dispatching ((BD2)-D-2), which address the above shortcomings and take advantage of information that should be readily available in centrally controlled systems. The latter rule also uses a new concept for device dispatching in that all the devices (empty or otherwise) are allowed to ''bid'' on incoming move requests. Simulation results indicate that, compared to existing rules, both MOD STTF and (BD2)-D-2 improve system performance considerably.
引用
收藏
页码:226 / 239
页数:14
相关论文
共 10 条
[1]   DECENTRALIZED CONTROL OF AUTOMATED GUIDED VEHICLES ON A SIMPLE LOOP [J].
BARTHOLDI, JJ ;
PLATZMAN, LK .
IIE TRANSACTIONS, 1989, 21 (01) :76-81
[2]   PULL VERSUS PUSH STRATEGY FOR AUTOMATED GUIDED VEHICLE LOAD MOVEMENT IN A BATCH MANUFACTURING SYSTEM [J].
EGBELU, PJ .
JOURNAL OF MANUFACTURING SYSTEMS, 1987, 6 (03) :209-221
[3]   CHARACTERIZATION OF AUTOMATIC GUIDED VEHICLE DISPATCHING RULES [J].
EGBELU, PJ ;
TANCHOCO, JMA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :359-374
[4]  
Francis R.L., 1992, FACILITY LAYOUT LOCA
[5]   CONTROL OF MATERIAL HANDLING TRANSPORTER IN AUTOMATED MANUFACTURING [J].
HAN, MH ;
MCGINNIS, LF .
IIE TRANSACTIONS, 1989, 21 (02) :184-190
[6]  
Hodgson T. J., 1987, Material Flow, V4, P85
[7]  
KING RE, 1987, BELGIAN J OPERATIONS, V27, P3
[8]  
RUSSELL DS, 1984, MAT FLOW, V1, P271
[9]   DYNAMIC DISPATCHING ALGORITHM FOR SCHEDULING MACHINES AND AUTOMATED GUIDED VEHICLES IN A FLEXIBLE MANUFACTURING SYSTEM [J].
SABUNCUOGLU, I ;
HOMMERTZHEIM, DL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (05) :1059-1079
[10]   TRIP-BASED MATERIAL HANDLING SYSTEMS - THROUGHPUT CAPACITY ANALYSIS [J].
SRINIVASAN, MM ;
BOZER, YA ;
CHO, MS .
IIE TRANSACTIONS, 1994, 26 (01) :70-89