Analytic network process applied to project selection

被引:118
作者
Cheng, EWL [1 ]
Li, H
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[2] Edith Cowan Univ, Sch Management Informat Syst, Joondalup, WA 6027, Australia
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:4(459)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Owing to the complexity of a construction project, the analytic network process (ANP) is helpful to deal with interdependent relationships within a multicriteria decision-making model. This paper demonstrates an example to illustrate how to empirically prioritize a set of projects by using a five-level project selection model. A questionnaire was filled by a group of construction professionals of a medium-sized local developer and scores were computed for prioritizing the potential projects. The paper is relevant to both industry practitioners and researchers. Industry practitioners may adopt the weighted criteria for direct project selection or apply the ANP method to prioritize their own set of selection criteria. Researchers may rely on this paper as a point of departure for exploring other uses of ANP.
引用
收藏
页码:459 / 466
页数:8
相关论文
共 29 条
[1]  
Alidi AS., 1996, INT J PROJECT MANG, V14, P205, DOI DOI 10.1016/0263-7863(95)00076-3
[2]  
Badri M. A., 2001, International Journal of Project Management, V19, P243, DOI 10.1016/S0263-7863(99)00078-2
[3]  
Behrens W., 1991, Manual for the Preparation of Industrial Feasibility Studies
[4]  
Cheng E. W. L., 2001, Information Management & Computer Security, V9, P61, DOI 10.1108/09685220110388827
[5]  
Cheng E.W. l., 2002, MEAS BUS EXCELL, V6, P33, DOI [10.1108/13683040210451697, DOI 10.1108/13683040210451697]
[6]  
CHENG EWL, 2004, IN PRESS CONSTR MANA
[7]   Improving objectivity in procurement selection [J].
Cheung, SO ;
Lam, TI ;
Wan, YW ;
Lam, KC .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (03) :132-139
[8]  
Chin K.S., 1999, Int. J. Qual. Reliab. Manag, V16, P341, DOI [DOI 10.1108/02656719910248226, 10.1108/02656719910248226]
[9]   An evaluation of vendor selection models from a Total Cost of Ownership perspective [J].
Degraeve, Z ;
Labro, E ;
Roodhooft, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 125 (01) :34-58
[10]  
*EXP CHOICE INC, 1996, EXP CHOIC WIND US MA