Production scheduling optimization algorithm for the hot rolling processes

被引:47
作者
Chen, A. L. [1 ]
Yang, G. K. [1 ]
Wu, Z. M. [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Automat, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
hot rolling production scheduling; vehicle routing problem; quantum particle swarm optimization; simulated annealing;
D O I
10.1080/00207540600988048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The hot rolling production scheduling problem is an extremely difficult and time-consuming process, so it is quite difficult to achieve an optimal solution with traditional optimization methods owing to the high computational complexity. To ensure the feasibility of solutions and improve the efficiency of the scheduling, this paper proposes a vehicle routing problem (VRP) to model the problem and develops an easily implemented hybrid approach (QPSO-SA) to solve the problem. In the hybrid approach, quantum particle swarm optimization (QPSO) combines local search and global search to search the optimal results and simulated annealing (SA) employs certain probability to avoid getting into a local optimum. The computational results from actual production data have shown that the proposed model and algorithm are feasible and effective for the hot rolling scheduling problem.
引用
收藏
页码:1955 / 1973
页数:19
相关论文
共 25 条
[1]   Optimal power flow using particle swarm optimization [J].
Abido, MA .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2002, 24 (07) :563-571
[2]   Field computation in non-linear magnetic media using particle swarm optimization [J].
Adly, AA ;
Abd-El-Hafiz, SK .
JOURNAL OF MAGNETISM AND MAGNETIC MATERIALS, 2004, 272 :690-692
[3]   A flexible decision support system for steel hot rolling mill scheduling [J].
Cowling, P .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (02) :307-321
[4]  
Eberhart R., 1995, MHS 95 P 6 INT S MIC, DOI DOI 10.1109/MHS.1995.494215
[5]  
IIRO H, 2001, COMPUT CHEM ENG, V25, P1647
[6]   OPTIMAL INTER-PROCESS STEEL PRODUCTION SCHEDULING [J].
JACOBS, TL ;
WRIGHT, JR ;
COBBS, AE .
COMPUTERS & OPERATIONS RESEARCH, 1988, 15 (06) :497-507
[7]  
Kennedy J, 1995, 1995 IEEE INTERNATIONAL CONFERENCE ON NEURAL NETWORKS PROCEEDINGS, VOLS 1-6, P1942, DOI 10.1109/icnn.1995.488968
[8]   Berth scheduling by simulated annealing [J].
Kim, KH ;
Moon, KC .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2003, 37 (06) :541-560
[9]   OPTIMIZATION BY SIMULATED ANNEALING [J].
KIRKPATRICK, S ;
GELATT, CD ;
VECCHI, MP .
SCIENCE, 1983, 220 (4598) :671-680
[10]   DISCRETE EVENT SEQUENCING AS A TRAVELING SALESMAN PROBLEM [J].
KOSIBA, ED ;
WRIGHT, JR ;
COBBS, AE .
COMPUTERS IN INDUSTRY, 1992, 19 (03) :317-327