Implementing a hybrid simulation model for a Kanban-based material handling system

被引:49
作者
Hao, Qi [1 ]
Shen, Weiming [1 ]
机构
[1] Natl Res Council Canada, Integrated Mfg Technol Inst, London, ON N6G 4X8, Canada
关键词
agent-based systems; material handling; discrete event simulation; JFT; Kanban;
D O I
10.1016/j.rcim.2007.09.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Plant floor material handling is a loose loop in most assembly plants. Simulation offers a quick, controllable and tunable approach for prototyping complex material handling processes in manufacturing environments. This paper proposes a hybrid simulation approach, using both discrete event and agent-based technologies, to model complex material handling processes in an assembly line. A prototype system is implemented using a commercial multi-paradigm modeling tool. In this prototype, JIT principles are applied to both the production and the material handling processes. The system performance is evaluated and system optimization directions are suggested. The proposed hybrid modeling approach facilitates the implementation of a responsive and adaptive environment in that various "what-if" scenarios can be simulated under different simulation configurations and real-time situations. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:635 / 646
页数:12
相关论文
共 38 条
[1]   A multi-criterion approach for Kanban allocations [J].
Andijani, AA .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1998, 26 (04) :483-493
[2]   DETERMINING THE NUMBER OF KANBANS IN MULTIITEM JUST-IN-TIME SYSTEMS [J].
ASKIN, RG ;
MITWASI, MG ;
GOLDBERG, JB .
IIE TRANSACTIONS, 1993, 25 (01) :89-98
[3]   A framework and a simulation generator for kanban-controlled manufacturing systems [J].
Aytug, H ;
Dogan, CA .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 34 (02) :337-350
[4]   DETERMINING THE NUMBER OF KANBANS IN A MULTIPRODUCT, MULTISTAGE PRODUCTION SYSTEM [J].
BARD, JF ;
GOLANY, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (05) :881-895
[5]  
Berkeley B. J., 1992, Production and Operations Management, V1, P393, DOI 10.1111/j.1937-5956.1992.tb00004.x
[6]   A SIMULATION STUDY OF SEQUENCING RULES IN A KANBAN-CONTROLLED FLOW-SHOP [J].
BERKLEY, BJ ;
KIRAN, AS .
DECISION SCIENCES, 1991, 22 (03) :559-582
[7]   EFFECT OF BUFFER CAPACITY AND SEQUENCING RULES ON SINGLE-CARD KANBAN SYSTEM PERFORMANCE [J].
BERKLEY, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (12) :2875-2893
[8]   Are push and pull systems really so different? [J].
Bonney, MC ;
Zhang, ZM ;
Head, MA ;
Tien, CC ;
Barson, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :53-64
[9]   MODELING AND ANALYSIS OF JUST-IN-TIME MANUFACTURING SYSTEMS [J].
GUNASEKARAN, A ;
GOYAL, SK ;
MARTIKAINEN, T ;
YLIOLLI, P .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) :23-37
[10]   The effect of sudden material handling system breakdown on the performance of a JIT system [J].
Gupta, SM ;
Al-Turki, YAY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (07) :1935-1960