Determinants of successful design-build projects

被引:103
作者
Lam, Edmond W. M. [1 ]
Chan, Albert P. C. [1 ]
Chan, Daniel W. M. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
关键词
D O I
10.1061/(ASCE)0733-9364(2008)134:5(333)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A construction project is mostly initiated by the needs of the client. In order to satisfy the client's requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.
引用
收藏
页码:333 / 341
页数:9
相关论文
共 38 条
[1]  
[Anonymous], ENG CONSTRUCTION ARC
[2]  
[Anonymous], 1995, CONSTRUCTION IND HON
[3]  
[Anonymous], 2000, CONSTR MANAG ECON
[4]  
[Anonymous], SEM P DES BUILD PROC
[5]  
Arditi D., 2003, Construction Management and Economics, V21, P175
[6]  
Babin B.J., 1998, Multivariate data analysis, V5th ed.
[7]  
Belsley D. A., 1980, REGRESSION DIAGNOSTI
[8]  
BLACK K, 1997, BUSINESS STAT CONT D
[9]   Framework of success criteria for design/build projects [J].
Chan, APC ;
Scott, D ;
Lam, EWM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) :120-128
[10]  
CHAN APC, 1996, THESIS U S AUSTR ADE