Nodal probabilistic production cost simulation considering transmission system unavailabilty

被引:6
作者
Choi, J. [1 ]
Tran, T. [1 ]
Kwon, J. [1 ]
Thomas, R. [2 ]
Mount, T. [3 ]
Billinton, R. [4 ]
机构
[1] Gyeongsang Natl Univ, Dept Elect Engn, Jinju, South Korea
[2] Cornell Univ, Dept Elect & Comp Engn, Ithaca, NY 14850 USA
[3] Cornell Univ, Sch Appl Econ & Management, Ithaca, NY 14850 USA
[4] Univ Saskatchewan, Dept Elect & Comp Engn, Saskatoon, SK, Canada
关键词
D O I
10.1049/iet-gtd:20060393
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A nodal probabilistic production cost simulation method is described for power system long-term expansion planning considering unavailability and delivery limitation constraints of the transmission system. This new nodal production cost simulation model includes capacity constraints and unavailabilities of generators as well as transmission lines. This simulation methodology comes from the nodal composite power system equivalent load duration curve (CMELDC), based on a new effective load model at load points developed by the authors. The nodal CMELDC can be obtained from convolution integral processing of the outage capacity probability distribution function of the fictitious generator and the original LDC. It is expected that the new simulation model based on the nodal CMELDC proposed here will provide solutions to many problems based on nodal and decentralised operation and control of electric power systems under a competition environment. The nodal CMELDC based on the new model at load points can extend application areas of nodal probabilistic production cost simulation, probabilistic congestion cost assessment, analytical outage cost assessment and nodal reliability evaluation and so on at load points. The characteristics and effectiveness of this new proposed methodology are illustrated by a small system case study using a network flow and enumeration method.
引用
收藏
页码:32 / 42
页数:11
相关论文
共 19 条
[1]  
[Anonymous], 1977, POWER SYSTEM PLANNIN
[2]  
[Anonymous], ELECT ENERGY GENERAT
[3]   Enhanced adequacy equivalent for composite power system reliability evaluation [J].
Billinton, R ;
Zhang, W .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1996, 143 (05) :420-426
[4]  
Billinton R., 1984, Reliability Evaluation of Power Systems, DOI DOI 10.1007/978-1-4615-7731-7
[5]  
Billinton R., 1994, Reliability assessment of electrical power systems using Monte Carlo methods
[6]  
BILLINTON R, 2006, KIEE J ELECT ENG TEC, V1, P414
[7]   A method for transmission system expansion planning considering probabilistic reliability criteria [J].
Choi, J ;
Tran, T ;
El-Keib, ARA ;
Thomas, R ;
Oh, S ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1606-1615
[8]   Development of a nodal effective load model considering transmission system element unavailabilities [J].
Choi, J ;
Billinton, R ;
Futuhi-Firuzabed, M .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2005, 152 (01) :79-89
[9]  
CHOI J, 2000, P IEEE PES SM2000 C
[10]  
CHOI J, 1997, OUTAGE COST ASSESSME