Buffer allocation plan for a remanufacturing cell

被引:38
作者
Aksoy, HK
Gupta, SA
机构
[1] Northeastern Univ, Dept MIE, Lab Responsible Mfg, Boston, MA 02115 USA
[2] Osmangazi Univ, Dept Stat, TR-26480 Eskisehir, Turkey
关键词
remanufacturing; buffer allocation; disassembly; open queueing networks; throughput;
D O I
10.1016/j.cie.2003.03.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We present a near optimal buffer allocation plan (NOBAP) specifically developed for a remanufacturing cell with finite buffers and unreliable servers. A remanufacturing cell is a self-reliant entity within which a variety of activities such as disassembly, inspection, material processing, remanufacturing, assembly and transportation are performed. The remanufacturing cell considered in this paper consists of three modules, viz. the disassembly and testing module for returned products, the disposition module for non-reusable returns and the remanufacturing module. We propose an algorithm that uses an open queueing network, decomposition principle and expansion methodology to analyze the remanufacturing cell. The buffer allocation algorithm distributes a given number of available buffer slots among the various stations (across the various modules) to optimize the cell's performance. The algorithm has been rigorously tested for both balanced and unbalanced cells. The results show that the performance of the algorithm is consistent, robust and produces excellent results in a variety of experimental conditions. (c) 2005 Elsevier Ltd. All rights reserved.
引用
收藏
页码:657 / 677
页数:21
相关论文
共 35 条
[1]   OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT [J].
BRENNAN, L ;
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (09) :57-67
[2]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241
[3]   Buffering from material recovery uncertainty in a recoverable manufacturing environment [J].
Guide, VDR ;
Srivastava, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (05) :519-529
[4]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[5]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589
[6]   Disassembly of products [J].
Gupta, SM ;
McLean, CR .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) :225-228
[7]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[8]  
Gupta SM, 1998, INT J IND ENG-THEORY, V5, P265
[9]   Production systems with interruptions, arbitrary topology and finite buffers [J].
Gupta, SM ;
Kavusturucu, A .
ANNALS OF OPERATIONS RESEARCH, 2000, 93 (1-4) :145-176
[10]   An algorithm for optimal buffer placement in reliable serial lines [J].
Harris, JH ;
Powell, SG .
IIE TRANSACTIONS, 1999, 31 (04) :287-302