Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm

被引:210
作者
Al-Hinai, Nasr [1 ]
ElMekkawy, T. Y. [1 ]
机构
[1] Univ Manitoba, Dept Mech & Mfg Engn, Winnipeg, MB R3T 5V6, Canada
关键词
Robust; Stable; Flexible job shop scheduling problem; Machine breakdowns; UNCERTAIN PROCESSING TIMES; PARTIAL ORDER SCHEDULES; SINGLE-MACHINE; EVOLUTIONARY ALGORITHMS; GENERATING ROBUST; SEARCH; DECOMPOSITION; OPTIMIZATION; HEURISTICS; FRAMEWORK;
D O I
10.1016/j.ijpe.2011.04.020
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the problem of finding robust and stable solutions for the flexible job shop scheduling problem with random machine breakdowns. A number of bi-objective measures combining the robustness and stability of the predicted schedule are defined and compared while using the same rescheduling method. Consequently, a two-stage Hybrid Genetic Algorithm (HGA) is proposed to generate the predictive schedule. The first stage optimizes the primary objective, minimizing makespan in this work, where all the data is considered to be deterministic with no expected disruptions. The second stage optimizes the bi-objective function and integrates machines assignments and operations sequencing with the expected machine breakdown in the decoding space. An experimental study and Analysis of Variance (ANOVA) is conducted to study the effect of different proposed measures on the performance of the obtained results. Results indicate that different measures have different significant effects on the relative performance of the proposed method. Furthermore, the effectiveness of the current proposed method is compared against three other methods; two are taken from literature and the third is a combination of the former two methods. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:279 / 291
页数:13
相关论文
共 66 条
[11]  
Cai X, 1996, NAV RES LOG, V43, P1127, DOI 10.1002/(SICI)1520-6750(199612)43:8<1127::AID-NAV5>3.0.CO
[12]  
2-G
[13]  
Cavalieri S., 2006, International Journal of Manufacturing Technology and Management, V8, P248, DOI 10.1504/IJMTM.2006.008803
[14]   A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling [J].
Chtourou, Hedi ;
Haouari, Mohamed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (01) :183-194
[15]   Dynamic scheduling of steel casting and milling using multi-agents [J].
Cowling, PI ;
Ouelhadj, D ;
Petrovic, S .
PRODUCTION PLANNING & CONTROL, 2004, 15 (02) :178-188
[16]   ROBUST SCHEDULING TO HEDGE AGAINST PROCESSING TIME UNCERTAINTY IN SINGLE-STAGE PRODUCTION [J].
DANIELS, RL ;
KOUVELIS, P .
MANAGEMENT SCIENCE, 1995, 41 (02) :363-376
[17]  
DAVENPORT A, 2002, SURVEY TECHNIQ UNPUB
[18]   IDENTIFICATION OF ROBUST SCHEDULING HEURISTICS - APPLICATION OF TAGUCHI METHODS IN SIMULATION STUDIES [J].
DOOLEY, KJ ;
MAHMOODI, F .
COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 22 (04) :359-368
[19]   Mathematical modeling and heuristic approaches to flexible job shop scheduling problems [J].
Fattahi, Parviz ;
Mehrabad, Mohammad Saidi ;
Jolai, Fariborz .
JOURNAL OF INTELLIGENT MANUFACTURING, 2007, 18 (03) :331-342
[20]   Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability [J].
Fattahi, Parviz ;
Fallahi, Alireza .
CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2010, 2 (02) :114-123