Data driven production modeling and simulation of complex automobile general assembly plant

被引:92
作者
Wang, Junfeng [1 ]
Chang, Qing [2 ]
Xiao, Guoxian [3 ]
Wang, Nan [1 ]
Li, Shiqi [1 ]
机构
[1] Huazhong Univ Sci & Technol, Dept Ind & Mfg Syst Engn, Wuhan 430074, Hubei, Peoples R China
[2] New York Inst Technol, Dept Mech Engn, Old Westbury, NY 11568 USA
[3] Gen Motors Res & Dev Ctr, Mfg Syst Res Lab, Warren, MI 48090 USA
关键词
Data driven approach; Modeling and simulation; General assembly plant; Material handling system; JIT; FRAMEWORK;
D O I
10.1016/j.compind.2011.05.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Flexible manufacturing and customization has long been a topic in modern manufacturing society. However, challenges still remain on the responsiveness of production system to the fluctuation of market demand. In this paper, we developed a data driven simulation methodology to automatically model a production system and rapidly modify the model corresponding to dynamic requirements and real time information. This methodology provides a "rapid prototyping" capability for production system modeling and enables a quick analyzing and remodeling capability to respond to the fluctuation of demands. The approach is developed and applied to an automotive general assembly plant with an online material handling system. A complete information model based on IDEF1X is constructed for this domain specific modeling and simulation. The main simulation modules for assembly line and material handling system of the plant floor are analyzed and a simulator is implemented in ARENA by SIMAN/VBA program. The case study of an automotive assembly plant shows that the data driven approach enables the modeling and simulation of the complex assembly plant in a "real-time" fashion and therefore effectively improve the responsiveness and flexibility of the production line. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:765 / 775
页数:11
相关论文
共 36 条
[1]   Scheduling of flexible flow lines in an automobile assembly plant [J].
Agnetis, A ;
Pacifici, A ;
Rossi, F ;
Lucertini, M ;
Nicoletti, S ;
Nicolo, F ;
Oriolo, G ;
Pacciarelli, D ;
Pesaro, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 97 (02) :348-362
[2]  
[Anonymous], 2000, Simulation modeling and analysis
[3]  
Appleton Company, 1985, INT INF SUPP SYST IN
[4]   Simulation modelling and analysis of a JIT production system [J].
Baykoc, OF ;
Erol, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 55 (02) :203-212
[5]   MIXED MODEL ASSEMBLY SIMULATION [J].
CARLSON, JG ;
YAO, AC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1992, 26 (1-3) :161-167
[6]   Grand challenges in modeling and simulation of complex manufacturing systems [J].
Fowler, JW ;
Rose, O .
SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2004, 80 (09) :469-476
[7]   DATA DRIVEN MODELING - AN APPLICATION IN SCHEDULING [J].
FRANZ, LS .
DECISION SCIENCES, 1989, 20 (02) :359-377
[8]   Implementing a hybrid simulation model for a Kanban-based material handling system [J].
Hao, Qi ;
Shen, Weiming .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2008, 24 (05) :635-646
[9]  
Harrison GA, 2004, PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P191
[10]  
Heilala J, 2008, INT FED INFO PROC, V260, P371