Integrated discrete berth allocation and quay crane scheduling in port container terminals

被引:42
作者
Lee, Der-Horng [1 ]
Wang, Hui Qiu [1 ]
机构
[1] Natl Univ Singapore, Dept Civil Engn, Singapore 117548, Singapore
关键词
berth allocation; quay crane scheduling; port operation; CONSTRAINTS; OPERATIONS; BRANCH;
D O I
10.1080/03052150903406571
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The integrated discrete berth allocation and quay crane scheduling problem studied in this article considers the relationship between them. This article provides a mixed integer programming model for the studied problem that is [image omitted]-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Computational experiments are conducted to examine the proposed solution algorithm. The computational results show that the proposed genetic algorithm is effective and efficient in solving the studied problem.
引用
收藏
页码:747 / 761
页数:15
相关论文
共 25 条