Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time

被引:94
作者
Guinet, AGP
Solomon, MM
机构
[1] INSA de Lyon, Laboratoire d’Informatique des Systemes de Production Industrielle, Villeurbanne, 69621, bât. 403
[2] College of Business Administration, Northeastern University, Boston, MA
关键词
D O I
10.1080/00207549608904988
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling independent jobs on several serial workshops consisting of identical parallel machines is studied. Each job is processed by one machine in each workshop. This workshop environment is called a hybrid Flowshop. Each job has its own due-date and the objective is to minimize maximum tardiness or maximum completion time. Given that the problem is NP-hard, a set of list algorithms is developed to solve it. To evaluate the quality of these heuristics, lower bounds on the optimal solution have been derived and compared to the value of the heuristics on 1920 problems. Our results indicate that a heuristic based on Nawaz et al. (1983) method outperformed the other approaches.
引用
收藏
页码:1643 / 1654
页数:12
相关论文
共 33 条
[21]   ADDRESSING THE GAP IN SCHEDULING RESEARCH - A REVIEW OF OPTIMIZATION AND HEURISTIC METHODS IN PRODUCTION SCHEDULING [J].
MACCARTHY, BL ;
LIU, JY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (01) :59-79
[22]   SCHEDULING IN A 2-STAGE MANUFACTURING PROCESS [J].
NARASIMHAN, SL ;
PANWALKAR, SS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (04) :555-564
[23]   A COMPARISON OF SEQUENCING RULES FOR A 2-STAGE HYBRID FLOWSHOP [J].
NARASIMHAN, SL ;
MANGIAMELI, PM .
DECISION SCIENCES, 1987, 18 (02) :250-265
[24]  
NAUGHTON R, 1959, MANAGE SCI, V6, P1
[25]   A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM [J].
NAWAZ, M ;
ENSCORE, EE ;
HAM, I .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :91-95
[26]   A SURVEY AND EVALUATION OF STATIC FLOWSHOP SCHEDULING HEURISTICS [J].
PARK, YB ;
PEGDEN, CD ;
ENSCORE, EE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (01) :127-141
[27]  
PROUST C, 1992, P SUMM SCH SCHED INR, P297
[28]   A HEURISTIC FOR SCHEDULING IN FLOWSHOP AND FLOWLINE-BASED MANUFACTURING CELL WITH MULTICRITERIA [J].
RAJENDRAN, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (11) :2541-2558
[29]   PERFORMANCE OF SCHEDULING ALGORITHMS FOR NO-WAIT FLOWSHOPS WITH PARALLEL MACHINES [J].
SRISKANDARAJAH, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :365-378
[30]   SCHEDULING ALGORITHMS FOR FLEXIBLE FLOWSHOPS - WORST AND AVERAGE CASE PERFORMANCE [J].
SRISKANDARAJAH, C ;
SETHI, SP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 43 (02) :143-160