Economic impact analysts of load forecasting

被引:86
作者
Ranaweera, DK
Karady, GG
Farmer, RG
机构
[1] Dept. of Electrical Engineering, Arizona State University, Tempe
关键词
D O I
10.1109/59.630486
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper examines the economic impact of inaccurate load forecasts., Monte Carlo simulations were used to study the effect of different load forecasting accuracy, Investigations into the effect of improving the daily peak load forecasts, effect of different seasons of the year and effect of utilization factors are presented.
引用
收藏
页码:1388 / 1392
页数:5
相关论文
共 11 条
[1]  
[Anonymous], 1985, Comparative Models in Electrical Load Forecasting
[2]   WEATHER SENSITIVE SHORT-TERM LOAD FORECASTING USING NONFULLY CONNECTED ARTIFICIAL NEURAL NETWORK [J].
CHEN, ST ;
YU, DC ;
MOGHADDAMJO, AR ;
LU, CN ;
VEMURI, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :1098-1105
[3]   SHORT-TERM LOAD FORECASTING USING GENERAL EXPONENTIAL SMOOTHING [J].
CHRISTIAANSE, WR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1971, PA90 (02) :900-+
[4]   A NEW APPROACH TO STATISTICAL FORECASTING OF DAILY PEAK POWER DEMAND [J].
GOH, TN ;
ONG, HL ;
LEE, YO .
ELECTRIC POWER SYSTEMS RESEARCH, 1986, 10 (02) :145-148
[5]  
GRIFFITH JS, 1989, P PICA 89, P311
[6]   SHORT-TERM LOAD FORECASTING [J].
GROSS, G ;
GALIANA, FD .
PROCEEDINGS OF THE IEEE, 1987, 75 (12) :1558-1573
[7]  
*IEEE COMM REP, 1985, IEEE T POWER APPARAT, V104, P2072
[8]  
KAHN GJ, 1967, STAT MODELS ENG
[9]   ELECTRIC-LOAD FORECASTING USING AN ARTIFICIAL NEURAL NETWORK [J].
PARK, DC ;
ELSHARKAWI, MA ;
MARKS, RJ ;
ATLAS, LE ;
DAMBORG, MJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) :442-449
[10]   ADVANCEMENT IN THE APPLICATION OF NEURAL NETWORKS FOR SHORT-TERM LOAD FORECASTING [J].
PENG, TM ;
HUBELE, NF ;
KARADY, GG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (01) :250-257