A capacity-constrained multi-level inventory and production control problem

被引:25
作者
Segerstedt, A
机构
[1] Mälardalen University, Department of Production Economics, Linkoping Inst. of Technol.
关键词
multilevel lot sizing; capacity-constrained; MRP; Kanban; cover-time planning;
D O I
10.1016/0925-5273(96)00017-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a mathematical formulation of a capacity constrained multistage inventory and production control problem. It argues that most practical multistage inventory and production control problems can be summarised in the formulation. The model has a strong connection to the model of Billington, McClain and Thomas (1983) and is also inspired of a paper from Bard and Golany (1991). The revised Billington/McClain/Thomas model is formulated in a dynamic programming recursion. A numerical solution to a simple problem is presented. A scheduling problem concerning capacity constrained models are enlightened. Further, the paper points to differences and relationships between this capacity constrained model, MRP, Kanban and Cover-Time Planning.
引用
收藏
页码:449 / 461
页数:13
相关论文
共 20 条
[1]  
[Anonymous], CAPITAL COSTS INVENT
[2]   DETERMINING THE NUMBER OF KANBANS IN A MULTIPRODUCT, MULTISTAGE PRODUCTION SYSTEM [J].
BARD, JF ;
GOLANY, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (05) :881-895
[3]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[4]  
Grubbstrom R. W., 1989, RR121 LINK I TECHN D
[6]   FURTHER THEORETICAL CONSIDERATIONS ON THE RELATIONSHIP BETWEEN MRP, INPUT-OUTPUT-ANALYSIS AND MULTIECHELON INVENTORY SYSTEMS [J].
GRUBBSTROM, RW ;
MOLINDER, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 35 (1-3) :299-311
[7]   INTERTEMPORAL GENERALIZATION OF THE RELATIONSHIP BETWEEN MATERIAL REQUIREMENTS PLANNING AND INPUT-OUTPUT-ANALYSIS [J].
GRUBBSTROM, RW ;
OVRIN, P .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1992, 26 (1-3) :311-318
[8]  
GRUBBSTROM RW, 1968, PRODUKTIONSEKONOMISK
[9]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[10]  
Krajewski L. J., 1993, OPERATIONS MANAGEMEN