Robust Co-Optimization Planning of Interdependent Electricity and Natural Gas Systems With a Joint N-1 and Probabilistic Reliability Criterion

被引:124
作者
He, Chuan [1 ]
Wu, Lei [2 ]
Liu, Tianqi [1 ]
Bie, Zhaohong [3 ]
机构
[1] Sichuan Univ, Sch Elect Engn & Informat, Chengdu 610065, Sichuan, Peoples R China
[2] Clarkson Univ, Elect & Comp Engn Dept, Potsdam, NY 13699 USA
[3] Xi An Jiao Tong Univ, Shaanxi Key Lab Smart Grid, State Key Lab Elect Insulat & Power Equipment, Xian 710049, Shaanxi, Peoples R China
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
Co-optimization planning; N-1; contingency; power-to-gas; probabilistic reliability; robust optimization; POWER-TO-GAS; TRANSMISSION EXPANSION; WIND; GENERATION; CAPACITY;
D O I
10.1109/TPWRS.2017.2727859
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
As the sharp growth of gas-fired power plants and the new emergence of power-to-gas (PtG) technology intensify the interdependence between electricity and natural gas systems, it is imperative to co-optimize the two systems for improving the overall efficiency. This paper presents a long-term robust co-optimization planning model for interdependent systems, for minimizing total investment and operation costs. Beside generators, transmission lines, gas suppliers, and pipelines, PtGs and gas compressor stations are also considered as investment candidates to effectively handle wind power uncertainties in the power system and compensate pressure losses in the gas network. Furthermore, the proposed model includes a joint N-1 and probabilistic reliability criterion to promote economical and reliable planning solutions. The proposed model is solved via a decomposition approach, by iteratively solving a base-case master problem and two operation subproblems to check N-1 and probabilistic reliability criteria. Numerical case studies illustrate the effectiveness of the proposed robust co-optimization planning approach.
引用
收藏
页码:2140 / 2154
页数:15
相关论文
共 54 条
[31]   Integration N-1 of Contingency Analysis With Systematic Transmission Capacity Expansion Planning: ERCOT Case Study [J].
Majidi-Qadikolai, Mohammad ;
Baldick, Ross .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) :2234-2245
[32]   COMPUTABILITY OF GLOBAL SOLUTIONS TO FACTORABLE NONCONVEX PROGRAMS .1. CONVEX UNDERESTIMATING PROBLEMS [J].
MCCORMICK, GP .
MATHEMATICAL PROGRAMMING, 1976, 10 (02) :147-175
[33]   Reliability Evaluation of Power Systems Considering Restructuring and Renewable Generators [J].
Mehrtash, Amir ;
Wang, Peng ;
Goel, Lalit .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) :243-250
[34]  
MISO Energy, 2015, LOSS LOAD EXP LOLE F
[35]   An Adjustable Robust Optimization Approach for Contingency-Constrained Transmission Expansion Planning [J].
Moreira, Alexandre ;
Street, Alexandre ;
Arroyo, Jose M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (04) :2013-2022
[36]  
New York Independent System Operator Rensselaer NY USA, 2015, CONG ASS RES INT STU
[37]   Market-based congestion management in electric power systems with increased share of natural gas dependent power plants [J].
Pantos, Milos .
ENERGY, 2011, 36 (07) :4244-4255
[38]   Transmission Planning Under Uncertainties of Wind and Load: Sequential Approximation Approach [J].
Park, Heejung ;
Baldick, Ross .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2395-2402
[39]  
PJM, 2014, 2014 PJM RES REQ STU
[40]   A Linear Programming Approach to Expansion Co-Planning in Gas and Electricity Markets [J].
Qiu, Jing ;
Yang, Hongming ;
Dong, Zhao Yang ;
Zhao, Jun Hua ;
Meng, Ke ;
Luo, Feng Ji ;
Wong, Kit Po .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (05) :3594-3606