A Multi Time-Scale and Multi Energy-Type Coordinated Microgrid Scheduling Solution-Part I: Model and Methodology

被引:245
作者
Bao, Zhejing [1 ]
Zhou, Qin [2 ]
Yang, Zhihui [2 ]
Yang, Qiang [1 ]
Xu, Lizhong [3 ]
Wu, Ting [1 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Zhejiang, Peoples R China
[2] Accenture Technol Labs, Beijing 100020, Peoples R China
[3] Zhejiang Elect Power Co, Hangzhou 310007, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Combined cooling; heating and power (CCHP); coordinated scheduling; ice-storage air-conditioner; microgrid (MG); uncertainty; STORAGE SYSTEM; MANAGEMENT;
D O I
10.1109/TPWRS.2014.2367127
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
For optimal microgrid (MG) operation, one challenge is the supply of cooling and electricity energy is a coupled co-optimization issue when considering the combined cooling, heating and power (CCHP) units and ice-storage air-conditioners. Another challenge is the inherent randomness of renewable energy within the MG should be accommodated by MG itself. In Part I of this two-part paper, the partial load performance of CCHPs and the performance of ice-storage air-conditioners are modeled, and the cooling and electricity coordinated MG day-ahead scheduling and real-time dispatching models are established. In day-ahead scheduling model, the uncertainty of wind and solar power is represented by multi-scenarios and the objective is to achieve the minimal expected MG operation cost. In real-time dispatching model, the different time-scale dispatch schemes are respectively applied for cooling and electricity to smooth out the fluctuations of renewable energy supply and to follow the variations of cooling and electricity demands by the fine dispatching of the components within MG such that the impact of MG to the connected main grid is minimal. The proposed MG multi time-scale cooling and electricity coordinated schedule achieves an integrated optimization for multi energy-type supply, and makes the MG be controllable as seen from the main grid.
引用
收藏
页码:2257 / 2266
页数:10
相关论文
共 24 条
[1]
[Anonymous], 2009, 410066 CAPST TURB CO
[2]
[Anonymous], GAS TURBINE TECHNOL
[3]
Planned Scheduling for Economic Power Sharing in a CHP-Based Micro-Grid [J].
Basu, Ashoke Kumar ;
Bhattacharya, Aniruddha ;
Chowdhury, Sunetra ;
Chowdhury, S. P. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) :30-38
[4]
Smart energy management system for optimal microgrid economic operation [J].
Chen, C. ;
Duan, S. ;
Cai, T. ;
Liu, B. ;
Hu, G. .
IET RENEWABLE POWER GENERATION, 2011, 5 (03) :258-267
[5]
Optimization of an ice-storage air conditioning system using dynamic programming method [J].
Chen, HJ ;
Wang, DWP ;
Chen, SL .
APPLIED THERMAL ENGINEERING, 2005, 25 (2-3) :461-472
[6]
Scenario reduction in stochastic programming -: An approach using probability metrics [J].
Dupacová, J ;
Gröwe-Kuska, N ;
Römisch, W .
MATHEMATICAL PROGRAMMING, 2003, 95 (03) :493-511
[7]
A Novel Optimal Operational Strategy for the CCHP System Based on Two Operating Modes [J].
Fang, Fang ;
Wang, Qing H. ;
Shi, Yang .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :1032-1041
[8]
Gu W., 2011, P 2011 IEEE POW ENG
[9]
Optimal Power Management of Residential Customers in the Smart Grid [J].
Guo, Yuanxiong ;
Pan, Miao ;
Fang, Yuguang .
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2012, 23 (09) :1593-1606
[10]
Microgrids [J].
Hatziargyriou, Nikos ;
Asano, Hiroshi ;
Iravani, Reza ;
Marnay, Chris .
IEEE POWER & ENERGY MAGAZINE, 2007, 5 (04) :78-94