Expected makespan minimization on identical machines in two interconnected queues

被引:10
作者
Javidi, T [1 ]
Song, NO
Teneketzis, D
机构
[1] Univ Michigan, EECS Dept, Ann Arbor, MI 48109 USA
[2] Natl Inst Stand & Technol, Adv Network Technol Div, Gaithersburg, MD 20899 USA
关键词
D O I
10.1017/S026996480115401X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study the scheduling of jobs in a system of two interconnected service stations, called Q(1) and Q(2), on m(m greater than or equal to 2) identical machines available in parallel, so that every machine can process any jobs in Q(1) or Q(2). Preemption is allowed. Under certain conditions on the arrival, service, and interconnection processes, we determine a scheduling policy that minimizes the expected makespan.
引用
收藏
页码:409 / 443
页数:35
相关论文
共 18 条
[1]  
BRUNO J, 1981, J ASS COMPUTATIONAL, P28
[2]  
JAVIDI T, 2000, CGR00UO U MICH CONTR
[3]   Optimal scheduling on parallel processors with precedence constraints and general costs [J].
Liu, Z ;
Righter, R .
PROBABILITY IN THE ENGINEERING AND INFORMATIONAL SCIENCES, 1997, 11 (01) :79-92
[4]   PREEMPTIVE SCHEDULING WITH VARIABLE PROFILE, PRECEDENCE CONSTRAINTS AND DUE-DATES [J].
LIU, Z ;
SANLAVILLE, E .
DISCRETE APPLIED MATHEMATICS, 1995, 58 (03) :253-280
[5]  
LIU Z, 1995, SCHEDULING THEORY IT, P95
[6]  
LIU Z, 2001, IN PRESS J SCHEDULIN
[7]  
LIU Z, 1995, IEEE P 3 MASCOT WORK, P143
[8]  
PINEDO M, 1995, SCHEDULING
[9]  
Pinedo M., 1982, Deterministic and Stochastic Scheduling
[10]  
Ross SM., 2014, Introduction to stochastic dynamic programming