Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups

被引:33
作者
Anwar, MF [1 ]
Nagi, R [1 ]
机构
[1] SUNY BUFFALO,DEPT IND ENGN,BUFFALO,NY 14260
关键词
D O I
10.1080/002075497195416
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the integrated scheduling and lot-sizing problem in a manufacturing environment which produces complex assemblies. Given the due-dates of the end items, the objective is to minimize the cumulative lead time of the production schedule (total makespan) and reduce set-up and inventory holding costs. A JIT production strategy is adopted in which production is scheduled as late as possible (to minimize WIP costs), but without backlogging end items. The integrated scheduling and lot-sizing problem within such an environment has been formulated and is NP hard. An efficient heuristic is developed that schedules operations by exploiting the critical path of a network and iteratively groups orders to determine lot-sizes that minimize the makespan as well as set-up and holding costs. The performance of the proposed heuristic is evaluated and numerical results are presented comparing the savings achieved in makespan and cost over a lot-for-lot production strategy, and scheduling using an existing heuristic. More generally, this study demonstrates that lot-for-lot production in small batches may not be the best JIT strategy in an assembly environment with finite set-ups.
引用
收藏
页码:1447 / 1470
页数:24
相关论文
共 49 条
[1]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[2]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[3]  
Agrawal A, 1996, IIE TRANS, V28, P653
[4]  
[Anonymous], MAT REQUIREMENT PLAN
[5]  
[Anonymous], 1978, MANAGE SCI
[6]  
Ashour S., 1973, INT J PROD RES, V11, P47
[7]  
Ashour S, 1967, INT J PROD RES, V6, P109
[8]  
BAKER JR, 1985, MANAGE SCI, V35, P164
[9]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[10]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56