Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups

被引:33
作者
Anwar, MF [1 ]
Nagi, R [1 ]
机构
[1] SUNY BUFFALO,DEPT IND ENGN,BUFFALO,NY 14260
关键词
D O I
10.1080/002075497195416
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the integrated scheduling and lot-sizing problem in a manufacturing environment which produces complex assemblies. Given the due-dates of the end items, the objective is to minimize the cumulative lead time of the production schedule (total makespan) and reduce set-up and inventory holding costs. A JIT production strategy is adopted in which production is scheduled as late as possible (to minimize WIP costs), but without backlogging end items. The integrated scheduling and lot-sizing problem within such an environment has been formulated and is NP hard. An efficient heuristic is developed that schedules operations by exploiting the critical path of a network and iteratively groups orders to determine lot-sizes that minimize the makespan as well as set-up and holding costs. The performance of the proposed heuristic is evaluated and numerical results are presented comparing the savings achieved in makespan and cost over a lot-for-lot production strategy, and scheduling using an existing heuristic. More generally, this study demonstrates that lot-for-lot production in small batches may not be the best JIT strategy in an assembly environment with finite set-ups.
引用
收藏
页码:1447 / 1470
页数:24
相关论文
共 49 条
[41]  
SCHNIEDERJANS MJ, 1993, TOPICS JUST TIME MAN
[42]  
Silver E. A., 1973, Production Inventory Management, V2, P64
[43]   OPTIMAL MULTILEVEL LOT SIZING FOR REQUIREMENTS PLANNING SYSTEMS [J].
STEINBERG, E ;
NAPIER, HA .
MANAGEMENT SCIENCE, 1980, 26 (12) :1258-1271
[44]   A HEURISTIC FOR DYNAMIC MULTIITEM MULTILEVEL CAPACITATED LOTSIZING FOR GENERAL PRODUCT STRUCTURES [J].
TEMPELMEIER, H ;
HELBER, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :296-311
[45]   DYNAMIC VERSION OF THE ECONOMIC LOT SIZE MODEL [J].
WAGNER, HM ;
WHITIN, TM .
MANAGEMENT SCIENCE, 1958, 5 (01) :89-96
[46]   NETWORK PROGRAMMING-MODELS FOR PRODUCTION SCHEDULING IN MULTI-STAGE, MULTI-ITEM CAPACITATED SYSTEMS [J].
ZAHORIK, A ;
THOMAS, LJ ;
TRIGEIRO, WW .
MANAGEMENT SCIENCE, 1984, 30 (03) :308-325
[47]   A DETERMINISTIC MULTIPRODUCT MULTIFACILITY PRODUCTION AND INVENTORY MODEL [J].
ZANGWILL, WI .
OPERATIONS RESEARCH, 1966, 14 (03) :486-&
[48]   MINIMUM CONCAVE COST FLOWS IN CERTAIN NETWORKS [J].
ZANGWILL, WI .
MANAGEMENT SCIENCE, 1968, 14 (07) :429-450
[49]   BACKLOGGING MODEL AND A MULTI-ECHELON MODEL OF A DYNAMIC ECONOMIC LOT SIZE PRODUCTION SYSTEM - NETWORK APPROACH [J].
ZANGWILL, WI .
MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 15 (09) :506-527