Economic lot-sizing with remanufacturing options

被引:26
作者
Golany, B [1 ]
Yang, J
Yu, G
机构
[1] Technion Israel Inst Technol, Fac Ind Engn & Management, IL-32000 Haifa, Israel
[2] New Jersey Inst Technol, Dept Ind & Mfg Engn, Newark, NJ 07102 USA
[3] Univ Texas, Dept Management Sci & Informat Syst, Austin, TX 78712 USA
[4] Univ Texas, Ctr Management Operat & Logist, Austin, TX 78712 USA
关键词
D O I
10.1080/07408170108936890
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a production planning problem with remanufacturing. We provide the problem's general formulation and assess its computational complexity under various cost structures. We prove that the problem is NP-complete for general concave-cost structures. When costs are linear, we obtain an O(T-3) algorithm based on transforming the problem into the transportation problem in a special way. Finally, we suggest linearizing costs as an alternative for solving the problem in the real world.
引用
收藏
页码:995 / 1003
页数:9
相关论文
共 18 条
[1]   IMPROVED ALGORITHMS FOR ECONOMIC LOT-SIZE PROBLEMS [J].
AGGARWAL, A ;
PARK, JK .
OPERATIONS RESEARCH, 1993, 41 (03) :549-571
[2]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[3]   APPROXIMATION FORMULATIONS FOR THE SINGLE-PRODUCT CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
MATSUO, H .
OPERATIONS RESEARCH, 1986, 34 (01) :63-74
[4]   A SIMPLE FORWARD ALGORITHM TO SOLVE GENERAL DYNAMIC LOT SIZING MODELS WITH N PERIODS IN 0(N LOG N) OR 0(N) TIME [J].
FEDERGRUEN, A ;
TZUR, M .
MANAGEMENT SCIENCE, 1991, 37 (08) :909-925
[5]   Quantitative models for reverse logistics: A review [J].
Fleischmann, M ;
BloemhofRuwaard, JM ;
Dekker, R ;
vanderLaan, E ;
vanNunen, JAEE ;
VanWassenhove, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) :1-17
[6]   DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY [J].
FLORIAN, M ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1980, 26 (07) :669-679
[7]   AN O(N2(M+NLOGN)LOGN) MIN-COST FLOW ALGORITHM [J].
GALIL, Z ;
TARDOS, E .
JOURNAL OF THE ACM, 1988, 35 (02) :374-386
[8]   A FULLY POLYNOMIAL-APPROXIMATION SCHEME FOR SINGLE-PRODUCT SCHEDULING IN A FINITE-CAPACITY FACILITY [J].
GAVISH, B ;
JOHNSON, RE .
OPERATIONS RESEARCH, 1990, 38 (01) :70-83
[9]   Production planning and control for remanufacturing: industry practice and research needs [J].
Guide, VDR .
JOURNAL OF OPERATIONS MANAGEMENT, 2000, 18 (04) :467-483
[10]   Supply-chain management for recoverable manufacturing systems [J].
Guide, VDR ;
Jayaraman, V ;
Srivastava, R ;
Benton, WC .
INTERFACES, 2000, 30 (03) :125-142