Strategic selection of suitable projects for hybrid solar-wind power generation systems

被引:69
作者
Chen, Hsing Hung [2 ]
Kang, He-Yau [3 ]
Lee, Amy H. I. [1 ]
机构
[1] Chung Hua Univ, Dept Ind Management, Hsinchu, Taiwan
[2] Macau Univ Sci & Technol, Fac Management & Adm, Taipa, Macau, Peoples R China
[3] Natl Chin Yi Univ Technol, Dept Ind Engn & Management, Taichung, Taiwan
关键词
Fuzzy analytic hierarchy process (FAHP); Hybrid solar-wind power generation systems; Concentrating solar power (CSP) systems; ANALYTIC NETWORK PROCESS; RESOURCE ASSESSMENT; DECISION-MAKING; ENERGY; CHINA; DESIGN; MODEL; SPEED;
D O I
10.1016/j.rser.2009.08.004
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Because of the pressing need for maintaining a healthy environment with reasonable costs, China is moving toward the trend for generating electricity from renewable resources. Both solar energy and wind power have received a tremendous attention from private associations, political groups, and electric power companies to generate power on a large scale. A drawback is their unpredictable nature and dependence on weather. Fortunately, the problems can be partially tackled by using the strengths of one source to overcome the weakness of the other. Especially, a large fraction of the solar resource is available at times of peak electrical load. However, the complexity of using two different resources together makes the hybrid solar-wind generation systems more difficult to analyze. Accordingly, this paper first briefly introduces the solar-wind generation system and next develops its critical success criteria. Then, a fuzzy analytic hierarchy process associated with benefits, opportunities, costs and risks, is proposed to help select a suitable solar-wind power generation project. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:413 / 421
页数:9
相关论文
共 58 条
[1]   Wind resource assessment in the state of Arizona: Inventory, capacity factor, and cost [J].
Acker, Thomas L. ;
Williams, Susan K. ;
Duque, Earl P. N. ;
Brummels, Grant ;
Buechler, Jason .
RENEWABLE ENERGY, 2007, 32 (09) :1453-1466
[2]   Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects [J].
Agterbosch, Susanne ;
Glasbergen, Pieter ;
Vermeulen, Walter J. V. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2007, 11 (06) :1025-1055
[3]  
ARTIG R, 1995, P ANN C, P162
[4]  
ASPLIDEN C, 1981, PNLSA10063
[5]  
*AWEA, 2006, 10 STEPS BUILD WIND
[6]   ANNUAL AND SEASONAL-VARIATIONS IN MEAN WIND-SPEED AND WIND TURBINE ENERGY-PRODUCTION [J].
BAKER, RW ;
WALKER, SN ;
WADE, JE .
SOLAR ENERGY, 1990, 45 (05) :285-289
[7]   A review of power converter topologies for wind generators [J].
Baroudi, Janial A. ;
Dinavahi, Venkata ;
Knight, Andrew M. .
RENEWABLE ENERGY, 2007, 32 (14) :2369-2385
[8]   A dimensionless index evaluating the time complementarity between solar and hydraulic energies [J].
Beluco, Alexandre ;
de Souza, Paulo Kroeff ;
Krenzinger, Arno .
RENEWABLE ENERGY, 2008, 33 (10) :2157-2165
[9]   Making European-style community wind power development work in the US [J].
Bolinger, MA .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2005, 9 (06) :556-575
[10]   Methodology for optimally sizing the combination of a battery bank and PV array in a Wind/PV hybrid system [J].
Borowy, BS ;
Salameh, ZM .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 1996, 11 (02) :367-373