Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem

被引:116
作者
Framinan, JM
Leisten, R
Rajendran, C
机构
[1] Univ Duisburg, Inst Logist & Informat Management, Fac Business Adm & Econ, D-47048 Duisburg, Germany
[2] Univ Seville, Dept Org Ind & Gest Empresas, Escuela Super Ingn, E-41092 Seville, Spain
[3] Indian Inst Technol, Ind Engn & Management Div, Dept Humanities & Social Sci, Madras 600036, Tamil Nadu, India
关键词
D O I
10.1080/00207540210161650
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The polynomial heuristic of Nawaz/Enscore/Ham (NEH) is one of the best heuristics to minimize makespan in static-deterministic permutation flowshop problems. The NEH approach consists of two steps: (1) the generation of an initial order of jobs with respect to an indicator value and (2) the iterative insertion of jobs into a partial sequence according to the initial order of step 1. We generalize this approach to minimization of makespan, idletime and flowtime, construct 177 different initial orders, and evaluate their performance in the NEH-insertion approach. Based on a comprehensive numerical study, we propose heuristics for all three objective functions that outperform significantly the compared literature-based heuristics.
引用
收藏
页码:121 / 148
页数:28
相关论文
共 24 条
[1]   New heuristics to minimize total completion time in m-machine flowshops [J].
Allahverdi, A ;
Aldowaisan, T .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) :71-83
[2]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[3]  
BAMBERG G, 1998, STATISTIK
[4]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[5]  
French S., 1982, Sequencing and Scheduling
[6]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[7]  
Gupta J. N. D., 1972, AIIE T, V4, P11, DOI DOI 10.1080/05695557208974823
[8]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202
[9]   FLOWSHOP SEQUENCING WITH MEAN FLOWTIME OBJECTIVE [J].
HO, JC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (03) :571-578
[10]   AN EXTENSION OF PALMER HEURISTIC FOR THE FLOW-SHOP SCHEDULING PROBLEM [J].
HUNDAL, TS ;
RAJGOPAL, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) :1119-1124