Analytical models to predict the performance of a single-machine system under periodic and event-driven rescheduling strategies

被引:94
作者
Vieira, GE [1 ]
Herrmann, JW [1 ]
Lin, E [1 ]
机构
[1] Univ Maryland, Syst Res Inst, College Pk, MD 20742 USA
关键词
D O I
10.1080/002075400188654
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
This article presents initial results in the search for analytical models that can predict the performance of one-machine systems under periodic and event-driven rescheduling strategies in an environment where different job types arrive dynamically for processing and set-up must incur when production changes from one product type to another. The scheduling algorithm considered uses a first-in first-out dispatching rule to sequence jobs and it also groups jobs with similar types to save set-up time. The analytical models can estimate important performance measures like average how time and machine utilization, which can then be used to determine optimal rescheduling parameters. Simulation experiments are used to show that the analytical models accurately predict the performance of the single machine under the scheduling algorithm proposed.
引用
收藏
页码:1899 / 1915
页数:17
相关论文
共 10 条
[1]
Rescheduling job shops under random disruptions [J].
Abumaizar, RJ ;
Svestka, JA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) :2065-2082
[2]
ANALYSIS OF PERIODIC AND EVENT-DRIVEN RESCHEDULING POLICIES IN DYNAMIC SHOPS [J].
CHURCH, LK ;
UZSOY, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (03) :153-163
[3]
DHINGRA JS, 1992, P 1992 WINT SIM C, P849
[4]
A rolling horizon job shop rescheduling strategy in the dynamic environment [J].
Fang, J ;
Xi, YG .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1997, 13 (03) :227-232
[5]
Production scheduling/rescheduling in flexible manufacturing [J].
Jain, AK ;
Elmaraghy, HA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (01) :281-309
[6]
KIM MH, 1994, J MANUF SYST, V13, P85, DOI 10.1016/0278-6125(94)90024-8
[7]
A HEURISTIC RESCHEDULING ALGORITHM FOR COMPUTER-BASED PRODUCTION SCHEDULING SYSTEMS [J].
LI, RK ;
SHYU, YT ;
ADIGA, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (08) :1815-1826
[8]
Predictable scheduling of a job shop subject to breakdowns [J].
Mehta, SV ;
Uzsoy, RM .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1998, 14 (03) :365-378
[9]
ONE-MACHINE RESCHEDULING HEURISTICS WITH EFFICIENCY AND STABILITY AS CRITERIA [J].
WU, SD ;
STORER, RH ;
CHANG, PC .
COMPUTERS & OPERATIONS RESEARCH, 1993, 20 (01) :1-14
[10]
SCHEDULING AND RESCHEDULING WITH ITERATIVE REPAIR [J].
ZWEBEN, M ;
DAVIS, E ;
DAUN, B ;
DEALE, MJ .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1993, 23 (06) :1588-1596