Lag Time in Water Quality Response to Best Management Practices: A Review

被引:518
作者
Meals, Donald W. [1 ]
Dressing, Steven A. [2 ]
Davenport, Thomas E. [3 ]
机构
[1] Tetra Tech Inc, Burlington, VT 05401 USA
[2] Tetra Tech Inc, Alexandria, VA 22308 USA
[3] US EPA, Chicago, IL 60604 USA
关键词
LAND-USE CHANGE; SOIL-PHOSPHORUS; SHAGAWA LAKE; GREAT-LAKES; NITROGEN; NITRATE; COMMUNITIES; REDUCTIONS; VERMONT; STREAMS;
D O I
10.2134/jeq2009.0108
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Nonpoint source (NPS) watershed projects often fail to meet expectations for water quality improvement because of lag time, the time elapsed between adoption of management changes and rile detection of measurable improvement in water quality in the target water body. Even when management changes are well-designed and fully implemented, water quality monitoring efforts may not show definitive results if the monitoring period, program design, and sampling frequency are nor sufficient to address the lag between treatment and response. Tie main components of lag time include the time required for all installed practice to produce an effect, the time required for the effect to be delivered to the water resource, the time required for the water body to respond to the effect, and the effectiveness of the monitoring program to measure the response. The objectives of this review are to explore the characteristics of lag time components, to present examples of lag times reported from a variety of systems, and to recommend ways for managers to cope with the lag between treatment and response. Important processes influencing lag time include hydrology, vegetation growth, transport rate and path, hydraulic residence time, pollutant sorption properties, and ecosystem linkages. The magnitude of lag time is highly site and pollutant specific, bill may range from months to years for relatively short-lived contaminants such as indicator bacteria, years to decades for excessive P levels in agricultural soils, and decades or more for sediment accumulated in river systems. Groundwater travel time is also all important contributor to lag time and may introduce a lag of decades between changes in agricultural practices and improvement in water quality. Approaches to deal with the inevitable lag between implementation of management practices and water quality response lie in appropriately characterizing the watershed, considering lag time in selection, siting, and monitoring of management measures, selection of appropriate indicators, and designing effective monitoring programs to detect water quality response.
引用
收藏
页码:85 / 96
页数:12
相关论文
共 67 条
[41]   MEASURING NUTRIENT SPIRALLING IN STREAMS [J].
NEWBOLD, JD ;
ELWOOD, JW ;
ONEILL, RV ;
VANWINKLE, W .
CANADIAN JOURNAL OF FISHERIES AND AQUATIC SCIENCES, 1981, 38 (07) :860-863
[42]  
NEWSON J, 2007, THESIS U IDAHO MOSCO
[43]   The fate of nitrogen and phosphorus at the land sea margin of the North Atlantic Ocean [J].
Nixon, SW ;
Ammerman, JW ;
Atkinson, LP ;
Berounsky, VM ;
Billen, G ;
Boicourt, WC ;
Boynton, WR ;
Church, TM ;
Ditoro, DM ;
Elmgren, R ;
Garber, JH ;
Giblin, AE ;
Jahnke, RA ;
Owens, NJP ;
Pilson, MEQ ;
Seitzinger, SP .
BIOGEOCHEMISTRY, 1996, 35 (01) :141-180
[44]   Water quality response times to pasture management changes in small and large watersheds [J].
Owens, L. B. ;
Shipitalo, M. J. ;
Bonta, J. V. .
JOURNAL OF SOIL AND WATER CONSERVATION, 2008, 63 (05) :292-299
[45]  
PHILLIPS SW, 2003, FS09103 USGS MDDEDC
[46]   Relating extractable soil phosphorus to phosphorus losses in runoff [J].
Pote, DH ;
Daniel, TC ;
Sharpley, AN ;
Moore, PA ;
Edwards, DR ;
Nichols, DJ .
SOIL SCIENCE SOCIETY OF AMERICA JOURNAL, 1996, 60 (03) :855-859
[47]   HYDRAULIC RESIDENCE TIMES FOR THE LAURENTIAN GREAT-LAKES [J].
QUINN, FH .
JOURNAL OF GREAT LAKES RESEARCH, 1992, 18 (01) :22-28
[48]  
RAO PSC, 1985, P SOIL CROP SCI SOC, V44, P1
[49]   Detecting reductions in sediment loads associated with Ohio's conservation reserve enhancement program [J].
Richards, RP ;
Grabow, GL .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2003, 39 (05) :1261-1268
[50]  
ROSEBOOM DP, 1996, CR6291998 ISWS