An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations

被引:35
作者
DeReyck, B [1 ]
Herroelen, W [1 ]
机构
[1] UNIV CATHOLIQUE LOUVAIN, DEPT APPL ECON, OPERAT MANAGEMENT GRP, B-3000 LOUVAIN LA NEUVE, BELGIUM
关键词
D O I
10.1016/S0305-0548(97)00043-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we consider the resource-constrained project scheduling problem (RCPSP) with discounted cash flows and generalized precedence relations (RCPSPDC-GPR). The RCPSPDC-GPR extends the RCPSP to (a) arbitrary minimal and maximal time lags between the starting and completion times of activities and (b) the non-regular objective function of maximizing the net present value of the project with positive and/or negative cash flows associated with the activities. To the best of our knowledge, the literature on the RCPSPDC-GPR is completely void. We present a depth-first branch-and-bound algorithm in which the nodes: in the search tree represent the original project network extended with extra precedence relations which resolve a number of resource conflicts. These conflicts are resolved using the concept of minimal delaying modes, which is an extension of the notion of minimal delaying alternatives originally developed for the RCPSP. An upper bound on the project net present value as well as several dominance rules are used to fathom large portions of the search tree. Extensive computational experience on a randomly generated benchmark problem set is reported. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:1 / 17
页数:17
相关论文
共 57 条
[21]   PAYMENT SCHEDULING PROBLEM [J].
GRINOLD, RC .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1972, 19 (01) :123-&
[22]  
HERROELEN W, 1996, 9603 KATH U LEUV DEP
[23]   COMPUTATIONAL EXPERIENCE WITH AN OPTIMAL PROCEDURE FOR THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS [J].
HERROELEN, WS ;
GALLENS, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 65 (02) :274-277
[24]   Project network models with discounted cash flows a guided tour through recent developments [J].
Herroelen, WS ;
VanDommelen, P ;
Demeulemeester, EL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) :97-121
[25]   A branch and bound procedure for the resource constrained project scheduling problem with discounted cash flows [J].
Icmeli, O ;
Erenguc, SS .
MANAGEMENT SCIENCE, 1996, 42 (10) :1395-1408
[26]  
ICMELI O, 1994, COMPUTERS OPERATIONS, V8, P841
[27]   ON DYNAMIC-PROGRAMMING METHODS FOR ASSEMBLY LINE BALANCING [J].
KAO, EPC ;
QUEYRANNE, M .
OPERATIONS RESEARCH, 1982, 30 (02) :375-390
[28]   Project scheduling with discounted cash flows and progress payments [J].
Kazaz, B ;
Sepil, C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (10) :1262-1272
[29]  
Kelley Jr J. E., 1959, P E JOINT COMP C, V16, P160
[30]  
Kerbosh J. A G. M., 1975, KS11 U TECHN DEP IND