A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation

被引:65
作者
Bertel, S
Billaut, JC
机构
[1] Univ Tours, Ecole Polytech, Lab Informat, Dept Informat, F-37200 Tours, France
[2] ATOS, ORIGIN, F-41000 Blois, France
关键词
scheduling; heuristics; genetic algorithm; dispatching rules;
D O I
10.1016/s0377-2217(03)00434-x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We propose in this paper an effective heuristic algorithm to solve a scheduling problem that comes from industry. The workshop is an hybrid flow shop with recirculation and the problem is to perform jobs between a release date and a due date, in order to minimize the weighted number of tardy jobs. Firstly, an integer linear programming formulation of the problem is proposed, then a lower bound, a greedy algorithm and a genetic algorithm are described as approximate methods. To evaluate these heuristics, experiences on instances like industrial ones are computed, and show the efficiency of the genetic algorithm. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:651 / 662
页数:12
相关论文
共 33 条
[1]  
BERTEL S, 1999, INT C IND ENG PROD M, V1, P448
[2]  
BERTEL S, 2001, THESIS U TOURS TOURS
[3]  
BIERWIRTH C, 1995, OR SPEKTRUM, V17, P87, DOI 10.1007/BF01719250
[4]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[5]  
BRAH S, 1991, J INFORMATION OPTIMI, V12, P113, DOI DOI 10.1080/02522667.1991.10699055
[6]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[7]   A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors [J].
Brah, SA .
PRODUCTION PLANNING & CONTROL, 1996, 7 (04) :362-373
[8]  
Chen B., 1994, ADV OPTIMIZATION APP
[9]   MINIMIZING LATE JOBS IN THE GENERAL ONE MACHINE SCHEDULING PROBLEM [J].
DAUZEREPERES, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (01) :134-142
[10]  
DEJONG KA, 1977, DISS ABSTR INT, V36, pA5140