The role of performance measurement in continuous improvement

被引:98
作者
Bond, TC [1 ]
机构
[1] Univ Hull, Kingston Upon Hull HU6 7RX, N Humberside, England
关键词
performance measurement; continuous improvement; Kaizen; BPR;
D O I
10.1108/01443579910294291
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A research study of both kaizen and re-engineering Programmes in a leading international company indicated that the process life cycle has four characteristic stages. A newly designed process commonly suffers from a variety of teething problems during the initial post-commissioning phase. Once these have been eradicated achieving smooth product flow becomes important in accordance with JIT philosophy. A stable process may be improved by applying a kaizen continuous improvement programme. A dramatic step-change in performance may be achieved by radical re-engineering. It is suggested that each of these phases has its own characteristics which should be taken into account when determining Performance metrics and designing approaches to process monitoring and control Explicitly recognising the stage a process has reached in the life cycle provides guidance for practitioners effectively to direct and manage a programme of performance improvement.
引用
收藏
页码:1318 / 1334
页数:17
相关论文
共 34 条
[1]  
[Anonymous], 1992, HARVARD BUSINESS REV
[2]  
[Anonymous], 1996, J COST MANAGEMENT
[3]  
[Anonymous], STRATEGIES STYLES
[4]  
ARGYRIS C., 1978, Organizational Learning: a Theory of Action Perspective
[5]   A framework for proactive performance measurement system introduction [J].
Daniels, RC ;
Burns, ND .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1997, 17 (1-2) :100-&
[6]  
Deming E.W., 1982, Out of the crisis
[7]   An approach for relating total performance improvement with financial results [J].
Dervitsiotis, KN .
TOTAL QUALITY MANAGEMENT, 1997, 8 (01) :67-82
[8]   An integrated dynamic performance measurement system for improving manufacturing competitiveness [J].
Ghalayini, AM ;
Noble, JS ;
Crowe, TJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (03) :207-225
[9]   The changing basis of performance measurement [J].
Ghalayini, AM ;
Noble, JS .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (08) :63-&
[10]  
Goldratt E.M., 1990, HAYSTACK SYNDROME